Australia Coal and Laos Power: Operational and Financial Summary slide image

Australia Coal and Laos Power: Operational and Financial Summary

Australia coal: Western operations quarterly output SPRINGVALE CLARENCE OTHER OPERATIONS COAL OUTPUT (Mt) 1 COAL OUTPUT (Mt) 1 COAL OUTPUT (Mt) 1 CV: 6,700 kcal/kg 2 CV: 6,700 kcal/kg 2 CV: 6,700 kcal/kg 2 BANPU |0.6 0.6 0.6 0.6 0.6 0.7 0.6 0.7 0.8 0.5 0.5 4Q14 1015 2015 3Q15 4Q15 1Q16e 4Q14 1Q15 2015 3Q15 4Q15 1Q16e 0.2 0.3 TAME 4Q14 1Q15 2015 3Q15 4Q15 1Q16e COMMENTS Mth 1 Mth 2 Mth 3 LW 3 MOVE SCHEDULE 1 2 wk wks 12 -wks 3 wks 4Q14 1Q15 2Q15 3Q15 4Q15 1Q16e 2Q16e Springvale: " Following lengthy delays in obtaining State and Federal mining approvals - the mine returned to full production in mid-October. Best ever ramp-up following longwall changeover (and approval delays), achieving several daily and a weekly production record during 4Q15. EDO challenging Springvale approval process Clarence: production up 15% QoQ and 15% YoY setting new quarterly, semi-annual and calendar-year production records - following the return of the overhauled FCT and the introduction of a new FCT operating regime, combining Clarence experience with that of FCT operators around the world. Airly: production down 13% QoQ but up 14% YoY setting a new calendar-year production record. Angus Place: production ceased mid-February 2015, with mine placed on C&M Charbon: mining ceased in mid-August 2015 (reserves exhausted) 1 ROM output on an equity basis: Angus Place and Springvale 50%, Clarence 85% and Charbon 95% 2 CV figures are air-dried basis 3 Longwall 4 Flexible Conveyor Train Note: Following material overflow in reject emplacement area at Clarence in July, authorities were notified and actions were taken in compliance with NSW Environmental Protection Agency Clean-up Notice 20
View entire presentation