Australia Coal and Laos Power: Operational and Financial Summary
Australia coal: Western operations quarterly output
SPRINGVALE
CLARENCE
OTHER OPERATIONS
COAL OUTPUT (Mt) 1
COAL OUTPUT (Mt) 1
COAL OUTPUT (Mt) 1
CV: 6,700 kcal/kg 2
CV: 6,700 kcal/kg 2
CV: 6,700 kcal/kg 2
BANPU
|0.6
0.6 0.6
0.6
0.6 0.7 0.6 0.7
0.8
0.5
0.5
4Q14 1015 2015 3Q15 4Q15 1Q16e
4Q14 1Q15 2015 3Q15 4Q15 1Q16e
0.2 0.3 TAME
4Q14 1Q15 2015 3Q15 4Q15 1Q16e
COMMENTS
Mth 1
Mth 2
Mth 3
LW 3 MOVE SCHEDULE
1
2
wk
wks
12
-wks
3
wks
4Q14 1Q15 2Q15 3Q15 4Q15 1Q16e 2Q16e
Springvale:
"
Following lengthy delays in obtaining State and Federal mining approvals - the mine returned
to full production in mid-October.
Best ever ramp-up following longwall changeover (and approval delays), achieving several
daily and a weekly production record during 4Q15.
EDO challenging Springvale approval process
Clarence: production up 15% QoQ and 15% YoY setting new quarterly, semi-annual and
calendar-year production records - following the return of the overhauled FCT and the
introduction of a new FCT operating regime, combining Clarence experience with that of FCT
operators around the world.
Airly: production down 13% QoQ but up 14% YoY setting a new calendar-year production
record.
Angus Place: production ceased mid-February 2015, with mine placed on C&M
Charbon: mining ceased in mid-August 2015 (reserves exhausted)
1 ROM output on an equity basis: Angus Place and Springvale 50%, Clarence 85% and Charbon 95%
2 CV figures are air-dried basis
3 Longwall
4 Flexible Conveyor Train
Note: Following material overflow in reject emplacement area at Clarence in July, authorities were notified and actions were taken in compliance with
NSW Environmental Protection Agency Clean-up Notice