Fukushima Disaster Analysis

Made public by

sourced by PitchSend

10 of 14

Creator

tepcon logo
Tepcon

Category

Technology

Published

9/16/2013

Slides

Transcriptions

#1Fukushima Nuclear Power Plant Disaster Scott Brandon, Jay Pearson, Tiffany Rodriguez, Maria Salas#2What Happened Current Issues Action Plan Overview 9/16/2013 2#3What Happened at Fukushima • Earthquake of 9.0 magnitude hit East cost of Japan • Power Lines to Fukushima collapsed • Plant left without primary source of power • "Scram Mode" Backup Generators below plant kicked in 9/16/2013 3#4What Happened at Fukushima 15 meter tall Tsunami hit coast • Power plant only had 6 meter wall • Water flooded the site ⚫ Rendered the underground Diesel Generators useless Backup power now gone 9/16/2013 4#5What Happened at Fukushima Temperature and Pressure rose drastically within plants • Pressure Release Valve was ordered opened - Failed Build-up eventually caused sites 1,2,3 to explode • Released radioactive air into atmosphere Spilled contaminated water into ocean 9/16/2013 5#6Current Issues Cesium-137 used as material • Half life of 30 years Drinking water declared unsafe Cannot farm, soil exposure to radioactivity • Blackouts still present in surrounding area 3 of 6 reactors active • No alternative power solution for the area 9/16/2013 6#7Groundwater contamination at Fukushima Excess water from cooling system transfered to storage tanks Temporary storage tanks Tank leak Groundwater flow Source: Reuters Reactor building Turbine building Steel wall Figure 1 - Groundwater contamination diagram. [1] (under construction) Sea 9/16/2013#8How the 'ice wall' could work Sea Ice wall' Refrigeration plant Nuclear reactors 3. Coolant water chilled to -20 to -40 degrees pumped in and circulated Storage tanks Groundwater Google Figure 2 - The ice wall. [1] 4. This would create a wall of frozen soil 90 ft (27 metres) deep in 6-8 weeks preventing groundwater flow 1. Shafts drilled into ground around perimeter of damaged reactors. 2. 'Freeze pipes' 9/16/2013 8 Source: Tepco/Reuters#9Current Issues Stop leakage from storage tanks to ground water • Permanent steel wall under construction ⚫ Ice Wall solution, quicker, temporary and risky 9/16/2013#10Prepare for disaster Meet all safety regulations Make QRF 3 Teams Safety and containment Restore and rebuild Action Plan • Medical and communication 9/16/2013 10#11What Happened Current Issues Action Plan Conclusion 9/16/2013 11#12References 1. http://www.bbc.co.uk/news/world-asia-23940214 2. http://www.world-nuclear.org/info/Safety-and-Security/Safety-of- Plants/Fukushima-Accident-2011/#.UjaozsxVepl 3. http://www.reuters.com/article/2013/08/21/us-japan-fukushima-severity- idUSBRE97K02B20130821 4. http://ens-newswire.com/2013/09/05/japans-government-plans-ice-wall- to-control-fukushima-radiation/ 9/16/2013 12#13Any Questions? 9/16/2013 13

Download to PowerPoint

Download presentation as an editable powerpoint.

Related

1st Quarter 2021 Earnings Presentation image

1st Quarter 2021 Earnings Presentation

Technology

Rackspace Technology Q4 2022 Earnings Presentation image

Rackspace Technology Q4 2022 Earnings Presentation

Technology

CBAK Energy Technology Investor Presentation image

CBAK Energy Technology Investor Presentation

Technology

Jianpu Technology Inc 23Q1 Presentation image

Jianpu Technology Inc 23Q1 Presentation

Technology

High Performance Computing Capabilities image

High Performance Computing Capabilities

Technology

SOLOMON Deep Learning Case Studies image

SOLOMON Deep Learning Case Studies

Technology

1Q20 Earnings image

1Q20 Earnings

Technology

Nutanix Corporate Overview image

Nutanix Corporate Overview

Technology