Inverter-Based Resources: Challenges & Opportunities

Made public by

sourced by PitchSend

1 of 13

Creator

NREL logo
NREL

Category

Energy

Published

2023

Slides

Transcriptions

#1May 24, 2023 Inverter-Based Resources: Challenges & Opportunities Power Electronics Grid Interface (PEGI) Workshop aes#2Disclaimer 2 The AES Corporation 2023. All rights reserved. AES assumes no liability or responsibility for any errors or omissions in the content of the presentation. The information is provided "as is" with no guarantees of completeness or accuracy. Any opinions reflected in the presentation are solely those of the presenter and not necessarily those of AES. This presentation may contain copyrighted material which has not been specifically authorized for use in this presentation by the copyright owner. The presentation includes the material under the assumption that the use constitutes "fair use" under copyright law as it is for educational purposes and not for profit. aes#3Perspective Research Needs → Broaden ride-through capabilities for IBR's in GFM → When and how much GFM capacity will be needed? → Characteristics of IBR that introduce oscillations → How to predict grid impacts of IBRS with less intensive modeling → Common data models for inverter parameter settings → Inverter performance data and solutions for high performance in challenging environmental conditions aes 3#4Ride-through in Grid Forming Mode • →Grid needs . At high penetrations of IBR, IBR will be (or are) increasingly relied upon for grid forming mode (GFM) capability. Ride-through requirements for plants can be very wide, especially in island grids. GFM IBRS need to be online to form the grid when synchronous machines are no longer operating. 4 aes#5Ride-through in Grid Forming Mode Challenges • • Not many inverter companies are well- positioned to address these wide ride-through curves in GFM. Challenges with robust ride-through from different IBR manufacturers, particularly either low-voltage fault or frequency ride-through. Limited research is available on how IBRS respond to faults in GFM, especially asymmetrical faults. Opportunities • • Collaborate with IBR vendors on research to address these challenges. Analyze and publish fault data to inform probabilities of encountering different fault scenarios and inform ride-through curve requirements. 5 aes#6When and where will we need GFM capacity? North American Regional Reliability Councils and Interconnections Western Interconnection Québec Interconnection GFM is new, required for some projects in Hawaii. Each grid has different needs in terms of GFM performance. Not all inverter suppliers are ready to provide GFM capabilities. It is not currently well understood when and how much GFM capacity from IBRs will be needed in different regions. Research to determine this would be valuable. Eastern Interconnection NPCC FRCC RFC SERC SPP TRE Texas Interconnection MRO WECC ASCC Interconnection Source: North American Reliability Corporation Source: By Bouchecl - Own work, CC BY-SA 3.0, https://commons.wikimedia.org/w/index.php?curid=6750405 Have seen the grid can be stabilized with GFL up to high penetrations with reduction in P-f droop slope and/or tuning of converter PPL parameters. 6 aes#7What Causes Oscillations to be Introduced into the Grid by IBRS? (a) P [MW] 15 (i) IBR1 (ii) IBR2 (iii) IBR3 (iv) IBR4 IBR4 10 5 0 IBRI IBR2 www IBR3 0 0.1 0.2 0.3 Time [s] IBRs can introduce oscillatory modes into the grid. The grid may still be stable if these are well- damped. But... What inverter characteristics introduce oscillations on different grid types? How do we mitigate oscillations? • Mitigation options for GFL and GFM controls How do inverter and plant response times affect oscillations and system stability? Analysis of November 21, 2021, Kaua'i Island Power System 18-20 Hz Oscillations. 2023. https://arxiv.org/pdf/2301.05781.pdf 7 aes#8Predicting Impacts with Simpler or No Modeling? AES we are the energy PV PEAKER TESTBED 240 kW PV + 460 kWh BESS AES Distributed Energy 720-457-3005 CAUTION ROOM PROTECTED BY CLEAN AGEN) EMPTY ONLY CYMU 25G4 Models do not always capture all possible events. Version control issues with models as firmware rapidly evolves. Modeling resources (people & computational) and expertise can be limited. Research on ways to predict possible grid impacts of IBRs with less intensive or even no detailed models/modeling required would be valuable. ONLY aes 8#9Common Data Models for Inverter Parameter Settings Manufacturers do not present or share the same parameters or settings from the inverter and/or power plant controller (PPC). These parameters are critical for performance and tracking them important for ensuring consistent performance and in root cause analysis. A SunSpec/MESA type common data model could help improve parameter sharing and tracking. aes 9#10Understanding & Improving Inverter Performance in Challenging. Environmental Conditions Not the environment inverters are in Environmental conditions that plants operate in can cause challenges for inverters and other power electronics: • • • Mud/silt or dirt intake through cooling systems High humidity environments, marine environments Increasing temperatures over time could result in inverters operating at a de-rate or less efficiently Vendors and system owners are doing a lot of work here, but additional research could provide value: . How different environmental conditions affect inverters, and/or • Ways to predict potential failures, and/or • Increasing efficiency of power electronics in high temperature environments. 10 aes#11Thank you 11 Kelsey Horowitz [email protected] aes#12Disclaimer 12 12 The AES Corporation 2023. All rights reserved. AES assumes no liability or responsibility for any errors or omissions in the content of the presentation. The information is provided "as is" with no guarantees of completeness or accuracy. Any opinions reflected in the presentation are solely those of the presenter and not necessarily those of AES. This presentation may contain copyrighted material which has not been specifically authorized for use in this presentation by the copyright owner. The presentation includes the material under the assumption that the use constitutes "fair use" under copyright law as it is for educational purposes and not for profit. aes

Download to PowerPoint

Download presentation as an editable powerpoint.

Related

Q3 2020 Investor Presentation image

Q3 2020 Investor Presentation

Energy

New Fortress Energy Q3 2023 Investor Presentation image

New Fortress Energy Q3 2023 Investor Presentation

Energy

Helix Energy Solutions Company Update image

Helix Energy Solutions Company Update

Energy

2nd Quarter 2020 Investor Update image

2nd Quarter 2020 Investor Update

Energy

Helix Energy Solutions 2006 Annual Report image

Helix Energy Solutions 2006 Annual Report

Energy

Investor Presentation image

Investor Presentation

Energy

Investor Presentation image

Investor Presentation

Energy

Premium Rock, Returns, Runway 3Q 2022 Earnings image

Premium Rock, Returns, Runway 3Q 2022 Earnings

Energy