Investor Presentaiton

Made public by

sourced by PitchSend

5 of 13

Creator

PitchSend logo
PitchSend

Category

Pending

Published

Unknown

Slides

Transcriptions

#1Initiating Coverage SJVN Ltd October 31, 2022 CRETA RETAILRESEARCH ht. Lutt Lat fundamental ANALYSIS 4#2fundamental ANALYSIS SJVN Ltd HDFC securities 20 Click. Invest. Grow. YEARS Industry LTP Power Rs 35.75 HDFC Scrip Code BSE Code NSE Code Bloomberg SJVLTDEQNR 533206 35.75 3929.8 SJVN SJVN:IN CMP Oct 28, 2022 Equity Capital (Rs cr) Face Value (Rs) Equity Share O/S (cr) Market Cap (Rs cr) 392.98 14049.0 Book Value (Rs) 33.5 Avg. 52 Wk Volumes 10 3659239 36.90 25.45 52 Week High 52 Week Low Share holding Pattern % (Sep 2022) Promoters Institutions 86.77 6.81 Non Institutions Total 2 HDFCsec Retail research stock rating meter for details about the ratings, refer at the end of the report *Refer at the end for explanation on Risk Ratings Fundamental Research Analyst Nirmam Mehta [email protected] 6.42 100.00 Recommendation Buy in the band of Rs 35.5 - 36 and add on dips to Rs 32 Our Take: Base Case Fair Value Bull Case Fair Value Time Horizon Rs 39 Rs 42.75 2-3 quarters Satluj Jal Vidyut Nigam Limited (SJVN) has grown from a single project single state operation (i.e. 1500 MW Nathpa Jhakri Hydro Power Station in Himachal Pradesh) into a diversified power generation company having commissioned 8 projects aggregating 2091.5 MW of installed capacity and 86 km 400 KV transmission line. Its overall project portfolio (operational, under construction, pre-construction and projects in survey and investigation stage) comprises of 55 projects aggregating 31905 MW spread across 13 states and 3 countries. The management has a vision to have installed capacity of 5000 MW by 2023, 25000 MW by 2030 and 50000 MW by 2040. SJVN is primarily a hydropower generation company, diversifying into alternate energy sources such as thermal, solar and wind projects as well as into power transmission. A wholly owned subsidiary - SJVN Green Energy Limited (SGEL) was incorporated on March 30, 2022 for expanding the renewable energy portfolio of the group and work on new business ventures such as solar parks, biomass, small hydro, hybrid energy, green hydrogen and battery energy storage systems (BESS). There is a lot of untapped hydro potential in India with only 46 GW commissioned out of an estimated potential of 145 GW. In view of the Government's initiative to achieve 500 GW of installed electricity capacity from non-fossil sources by 2030, hydropower assumes greater importance to provide stability to the electric grid due to the intermittent availability of solar and wind to produce power. The company plays a key role in achieving the central government's objective of optimally tapping the hydropower potential in the northern region as well as strengthening bilateral relations through cross border hydropower development. The capacity addition outlook, regulated business model, consistent operational performance and favorable valuations make it an attractive investment idea. Valuation & Recommendation: With the expected commissioning of 1320 MW Buxar thermal power plant and 900 MW Arun-3 hydroelectric project (HEP) by FY24E, installed capacity is slated to more than double from the current 2091.5 MW. The full impact of the additional capacity will be visible in FY25, leading to a significant increase in revenue and profitability. Consistent operational performance of the Nathpa Jhakri HEP and Rampur HEP allows the company to earn incentives over and above the revenue from power generation. Government measures to promote hydropower and renewables would lead to higher offtake. FRETAILRES RETAILRESEARCH#33 fundamental ANALYSIS SJVN Ltd 20+ HDFC securities Click. Invest. Grow. YEARS SJVN Ltd has shared an aggressive capacity addition outlook, doubling their target of 12000 MW to 25000 MW by FY2030. The company trades at an attractive dividend yield of 4.8%. Dividend is expected to grow in the coming years as the earnings increase. We expect Revenue/EBITDA/PAT to grow at CAGR of 29.3%/28.0% / 24.2% over FY22-24E. We think the base case fair value of the stock is Rs 39 (10x FY24E EPS and 1.05x FY24E BV) and the bull case fair value is Rs 42.75 (11x FY24E EPS and 1.15x FY24E BV) over the next two-three quarters. Investors can buy the stock in the band of Rs 35.5-36 (9.2x FY24E EPS and 0.96x FY24E BV) and add more on dips to Rs 32 (8.2x FY24E EPS and 0.86x FY24E BV). Financial Summary Particulars (Rs cr) Q1FY23 Q1FY22 YOY-% Q4FY22 QoQ-% FY20 FY21 FY22 FY23E FY24E Total Operating Income 1004.1 662.5 51.6% 323.1 210.8% 2702.8 2485.4 2417.0 3152.0 4041.2 EBITDA 828.1 508.3 62.9% 142.6 480.9% 2030.5 1798.9 1726.4 2237.9 2828.9 Depreciation 100.4 96.5 4.1% 103.2 -2.7% 384.1 393.3 404.3 438.3 638.9 Other Income 68.1 42.4 60.5% 70.8 -3.8% 400.7 737.5 217.8 270.0 295.0 Interest Cost 144.5 Tax 81.9 APAT 609.2 26.2 103.0 342.1 451.3% -20.5% 78.1% 82.4 75.3% 268.1 -2.9 161.3 257.8 453.0 24.6 7.5 233.2% 8033.9% 404.7 482.1 326.2 454.1 509.1 1566.8 1645.6 989.8 1362.2 1527.3 EPS (Rs) RoE-% 4.0 13.0% 4.2 2.5 3.5 3.9 12.9% 7.5% 9.9% 10.5% P/E (x) EV/EBITDA 8.9 6.7 8.5 14.2 10.3 9.2 8.3 10.4 10.5 10.2 (Source: Company, HDFC sec) Q1FY23 Result Review: SJVN reported revenue from operations of Rs. 1,004 cr (up 51.6%/210.8% YoY/QoQ) of which Rs. 288 cr pertains to arrears of Rampur HPS based on the review petition filed with CERC for the period 2014-19. Generation increased by 12% from 2436 MUs in Q1FY22 to 2736 MUs in this quarter. PAF also registered an increase and machines were made available to the extent of 110.11% in NJHPS and 110.2% in RHPS. This also resulted in an increase in capacity incentives and unscheduled interchange (UI) i.e. deviation settlement incentives from Rs. 71.5 cr in Q1FY22 to Rs. 87.59 cr in Q1FY23. PBT also increased by 53% from Rs. 425 cr in quarter one of last year to Rs. 650 cr in Q1FY23. SJVN reported PAT of Rs. 607 cr (up 79% YoY). FRETAILRES RETAILRESEARCH#44 fundamental ANALYSIS SJVN Ltd 20+ HDFC securities Click. Invest. Grow. YEARS Project updates: Capital expenditure in Q1FY23 was Rs. 1,990 (up 320% YoY) against Rs. 662 cr in Q1FY22. SJVN awarded an EPC contract of 1000 MW solar project in Bikaner to Tata Power Solar Systems Ltd for a total value of Rs. 5,491 cr. The company also awarded the Gurhah and Gujrai solar power projects during the quarter. In Nepal, MOU has been signed for development of 490 MW Arun-4 through JV. SJVN also bagged the 90 MW full floating solar power project in Omkareshwar Reservoir in Madhya Pradesh and PPA was signed for the same. Key Triggers: Upcoming capacity to lead to higher earnings Additional capacity of 3415 MW is expected to be added by FY25E, an increase of ~160% from the existing capacity, providing a huge impetus to revenue. The key projects are the Buxar Thermal Power Plant in Bihar and the Arun-3 HEP in Nepal. Status of 1320 MW Buxar thermal power plant SJVN is expecting to commission one unit (660 MW) of the super critical thermal power plant in June 2023 and the second unit in January 2024. Rs. 5,768 Cr has been incurred on the project out of the total anticipated cost of Rs. 10,439 Cr as of July 31, 2022 (55%). Work for power evacuation through 4 transmission lines has commenced after receiving the grant of connectivity for power transmission in March 2022. Power Purchase Agreement (PPA) has been signed with Bihar State Power Holding Company Limited (BSPHCL) for 85% share of power. Fuel supply has also been secured with CCL for supply of the full quantum of 4.976 MTPA of coal requirement of the station at the price notified by Coal India Limited (CIL). The project has faced some law and order problem from the locals; however, now it is on track. Cost of power is expected to be competitive due to proximity of coalmines and hence higher-ranking order in the merit order of state discom leading to full scheduling of power from the plant. Status of Arun-3 HEP Arun-3 hydroelectric project is a 900 MW project located on the Arun River in Nepal. The project is a run-of-the-river scheme designed to generate 3924 MUs energy annually. The project is allocated to SJVN on Build Own Operate and Transfer (BOOT) basis, to be operated for 25 years after commissioning. Civil works were impacted because of heavy rains and flash floods in February and March 2022, which impacted the dam concreting, powerhouse and head race tunnel (HRT). 8.7 kms HRT has been excavated out of the total 11.8 kms. Geological issues have slowed down the pace of HRT works. Procurement/fabrication of different components for Hydro mechanical and Electro mechanical works is in advanced stage. Challenges are also being faced on the transmission front. The project is expected to be commissioned by December 2023. MOU has also been signed with PTC India for sale of hydropower from this project to RETAILRESEARCH FRE#55 fundamental ANALYSIS SJVN Ltd HDFC securities 20 Click. Invest. Grow. YEARS state utilities, discoms, bulk consumers, etc in India on long-term basis and sell untied capacity to power exchanges on medium/short term basis. Other hydropower projects • • Naitwar Mori HEP (60 MW) run of the river HEP on river Tons in Uttarakhand. The project is expected to be commissioned by December 2022 and the power sold by this project shall qualify as Hydro Purchase Obligation (HPO). MOU has been signed with PTC to sell its power under various opportunities to state utilities, discoms and consumers. Luhri HEP Stage I (210 MW) on river Satluj in Himachal Pradesh. Foundation stone was laid on December 27, 2021 and financial closure was achieved on February 28, 2022. The project is expected to be commissioned in FY26. Dhaulasiddhi HEP (66 MW) on river Beas in Himachal Pradesh. Foundation stone was laid on December 27, 2021 and financial closure was achieved on April 18, 2022. The project is expected to be commissioned in FY26. Kholongchhu HEP (600 MW) on river Kholongchhu in Bhutan. SJVN and Druk Green Power Corporation (DGPC) were developing the project in JV mode. However, due to the slow pace of execution and delay in decision-making, the Bhutanese side have recommended closure of JV. The matter is being discussed on a ministerial level between India and Bhutan. Renewables 4 solar power projects with 1195 MW capacity are under construction. Tariff Expected Commissioning December 2022 Name Bagodra Solar Power Project Gurhah Solar Power Project Capacity 70 MW 75 MW Rs. 2.21/unit Rs. 2.98/unit Gujrai Solar Power Project Solar Project under CPSU Scheme 50 MW 1000 MW Rs. 2.98/unit Rs. 2.45/unit May 2023 May 2023 May 2024 Additionally, 11 projects with 1878 MW capacity are under Investment approval and Pre-Construction stage and 12 projects of 4538 MW are in Survey and Investigation stage. The Ministry of Power has also identified 5 hydro projects of 5097 MW in Dibang basin of Arunachal Pradesh for allocation to SJVN. Further, 10 Pumped storage projects having estimated capacity of 13950 MW have been identified for allocation by the ministry. With the central and state governments, trying to expedite approvals and management vision of having installed capacity of 25000 MW by 2030, SJVN's growth potential is visible for the next 8 - 10 years. FRETAILRES RETAILRESEARCH#66 fundamental ANALYSIS SJVN Ltd 20+ HDFC securities Click. Invest. Grow. YEARS Policy measures by the government to promote hydropower sector augurs well for the company The Government has approved a number of measures for promoting hydropower sector. These include: • Declaring large hydro power (LHPs) (>25 MW projects) as renewable energy source Mandating Hydro Purchase Obligation (HPO) as a separate entity within Non-solar Renewable Purchase Obligation (RPO) from new projects Providing flexibility to developers to back load tariff by increasing project life to 40 years Increasing debt repayment period to 18 years Tariff rationalization measures for bringing down hydropower tariff Budgetary support for Flood Moderation/Storage Hydro Electric Projects (HEPs) and towards cost of enabling infrastructure, i.e. roads/bridges. Because of these measures, the capital cost as well as the project tariff would be reduced especially in initial years, which would improve project viability & saleability, and thus, promote the hydroelectric projects. Cost-Plus Return on Equity model to ensure stable returns The operational hydropower plants have regulated tariff structure that allow recovery of the entire cost, including a fixed return on equity based on approved capital cost, subject to achievement of normative parameters notified by the Central Electricity Regulatory Commission (CERC) for each plant. The company has a decade-long record of operating at more than normative level. For FY22, the PAF for both the hydro plants was 106% (FY21 - 105%), well above the normative levels of 90% for Nathpa Jhakri HPS and 85% for Rampur HPS. The company expects ROE to continue at a rate of 16.5% for storage type hydro projects (norms tightened, receivable days 45 days from 60 days, escalation 4.77% instead of 6.64%). The tariff for Buxar thermal power plant is also based on CERC guidelines, which allow recovery of fixed charges and pass-through of energy charges, along with assured return on equity and incentives. This is a significant source of comfort, as it will offer steady revenues, assured return as well as comfortable debt servicing, subject to operating at normative parameters (minimum plant availability factor of 85%). Fuel cost pass-through will result in full recovery of variable costs, subject to operations within the normative parameters. FRETAILRES RETAILRESEARCH#77 fundamental ANALYSIS SJVN Ltd 120.00% 100.00% 80.00% Nathpa Jhakri HPS HDFC securities 20 Click. Invest. Grow. YEARS 120.00% 100.00% Rampur HPS 80.00% 60.00% 60.00% 40.00% 40.00% 20.00% 20.00% 0.00% 0.00% FY15 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY15 FY16 FY17 FY18 FY19 FY20 FY21 FY22 Normative PAF Actual PAF Normative PAF Actual PAF (Source: Company, HDFC sec) Comfortable liquidity position The company had cash and cash equivalents amounting to Rs. 2902 Cr as on March 31, 2022. Strong cash flow from operations, unutilized bank lines and short-term loans would be sufficient to meet the debt obligations, capex requirements and dividend payouts. The company is also in the process to monetize a part of its cashflows from NJHPS and raise Rs. 2000 Cr to fund the equity portion of the upcoming projects. Cash and Cash Equivalents (in Cr) 4,000 3,614 3,500 2,966 3,000 2,335 2,500 2,000 1,500 1,000 500 1,305 2,902 Cash Flow from Operations (in Cr) 2,500 2,137 1,982 2,000 1,641 1,713 1,500 1,258 1,731 1,505 1,017 1,000 500 FY18 FY19 FY20 FY21 FY22 FY23E FY24E FY18 FY19 FY20 FY21 FY22 FY23E 1,963 FY24E (Source: Company, HDFC sec) FRETAILRES RETAILRESEARCH#88 fundamental ANALYSIS SJVN Ltd 20+ HDFC securities Click. Invest. Grow. YEARS Regular receivables (excluding unbilled revenue and bills discounted) as on March 31, 2022, reduced to Rs 574 crore (equivalent to 87 days) compared to Rs 853 crore a year earlier (equivalent to 127 days), due to receipt of the Aatmanirbhar Bharat package and timely collections of current dues. More than 90% of the dues as on March 31, 2022, were from Jammu & Kashmir. The management expects the dues to be liquidated by July 2023 in 12 equal installments of Rs. 53 cr each. The company's Net Debt/EBITDA increased from 0.5x in FY21 to 2.3x in FY22 and we expect it to remain elevated in FY23-24 as well, until a few of the large projects are commissioned. However, the debt to equity ratio is comfortable at 0.5x in FY22. Concerns: • • • • • The company has planned a huge capex. Given that there are many projects in the pipeline, the company faces execution risks. Significant time or cost overruns in under-construction projects may affect the cost competitiveness of these projects. Disallowance of capital costs by CERC may affect the cash flow available for debt servicing. Inability to tie up PPAs by the beneficiary states at the expected tariff or disowning a signed PPA where tariff of the project is high. However, separate HPO obligation notified by the government should help mitigate this risk. Geo-political risks due to execution of projects in Nepal and Bhutan. Other issues such as delay in decision making, differences with respect to employment of local population, government involvement, funding issues, etc also affects the progress of these projects. Risks of delays in payment due to weak financial health of state discoms. The receivables are expected to reduce over the medium term with the new Electricity (Late Payment Surcharge and Related Matters) Rules, 2022. The counterparty risks are mitigated by the presence of various payment security mechanisms, such as sales backed by letters of credit, tripartite agreements between the central government, the Reserve Bank of India (RBI) and state governments, and incentive schemes for timely payment. A majority of hydroelectric projects is located in remote locations and is prone to natural calamities such as landslide, cloud burst, etc. Further, erratic rains and flash floods may delay construction of the projects. Geological surprises posing technical challenges despite extensive survey and investigation may slow down the progress and increase the cost. Delay in getting approvals from various government authorities. Newer hydro projects are becoming costlier while tariffs of solar and wind have continued to go down, reducing the attractiveness of the hydro projects. However, hydropower may command a little premium due to the grid stability it provides. Economical battery storage solution on a large scale may make hydropower generation unviable. NJHPS and RHPS are cascade schemes and operating in tandem. Any difficulties faced in the operation of NJHPS will have direct consequences on power generation of RHPS. Government (of India and HP together) stake is at 87%, which needs to be brought down to 75%. Any stake sale is likely to be seen as an overhang in the market. FRETAILRES RETAILRESEARCH#9fundamental ANALYSIS SJVN Ltd 6 20+ HDFC securities Click. Invest. Grow. YEARS About the company: Satluj Jal Vidyut Nigam Limited or popularly known as SJVN Limited is primarily engaged in the business of generation and sale of power. The company is a Mini Ratna, a joint venture of the Government of India (GOI) and the Government of Himachal Pradesh (GOHP). Gol holds a majority equity stake of 59.92% in SJVN while the Government of Himachal Pradesh (GoHP) has a 26.85% stake. The Mini Ratna status gives the company greater operational autonomy and discretion to set up projects up to Rs. 500 cr without the express consent of the government. It operates the Nathpa Jhakri Hydro Power Station with a capacity of 1500 MW located in Shimla district, Himachal Pradesh, India; and the Rampur Hydro Power Station with a capacity of 412 MW in Kullu District, Himachal Pradesh. RHPS is a tailrace extension of NJHPS, which opeartes in tandem with generation flow of NJHPS. The units of NJHPS & RHPS were synchronized one by one and the projects were declared under COD on 18.05.2004 & 16.12.2014 respectively. NJHPS and RHPS are designed to generate 6612 MU & 1878.08 MU of Annual Electrical Energy respectively, in a 90% dependable year with 95% machine availability. Besides, the projects are designed to provide peaking power to the Northern Grid. The Power generated from these projects is being supplied to the various Bulk Power Customer / Beneficiaries / Utilities in Northern Region as per the Power Purchase Agreement (PPA) and allocation order issued by Ministry of Power, GOI. Out of the total energy generated from NJHPS, 12% is supplied free of cost to the home state i.e. Himachal Pradesh. From the remaining 88%, 25% energy is supplied to GoHP at bus-bar rate and the Ministry of Power, Government of India, allocated balance power to different states / UTs of Northern Region. Similarly, out of the total energy generated from Rampur HPS, 13% is supplied free of cost to the home state i.e. Himachal Pradesh. From the remaining 87%, 30% energy is supplied to GoHP at bus-bar rate and the Ministry of Power, Government of India, allocated balance power to different states / UTs of Northern Region. The company also operates the Khirvire Wind Power Plant with a capacity of 47.6 MW in Nashik District, Maharashtra; the Charnakha Solar Power Plant with a capacity of 5 MW in Patan District, Gujarat; and an 86 km cross border transmission line with a capacity of 400 kV from Muzaffarpur to Sursand. In addition, it provides consultancy services in the field of hydropower, road/railway tunnels, etc., as well as from concept to commissioning of hydroelectric projects to various organizations. RETAILRESEARCH FRETAILRES ESEARCH#10fundamental ANALYSIS Financials Income Statement SJVN Ltd HDFC securities 20 Click. Invest. Grow. YEARS Balance Sheet (Rs Cr) FY20 FY21 FY22 FY23E FY24E As at March (Rs Cr) FY20 FY21 FY22 FY23E FY24E Net Revenues 2702.8 2485.4 2417.0 3152.0 4041.2 SOURCE OF FUNDS Growth (%) 2.2% -8.0% -2.8% 30.4% 28.2% Share Capital - Equity 3929.8 3929.8 3929.8 Operating Expenses 672.3 686.5 690.6 914.1 1212.4 Reserves 8121.3 8861.5 9240.5 3929.8 9895.4 EBITDA 2030.5 1798.9 1726.4 2237.9 2828.9 Total Shareholders Funds 12051.1 12791.3 13170.3 13825.2 3929.8 10636.7 14566.5 Growth (%) 0.4% -11.4% -4.0% 29.6% 26.4% Long Term Debt 1972.2 1855.7 6170.2 10266.2 15711.1 EBITDA Margin (%) 75.1% 72.4% 71.4% 71.0% 70.0% Short Term Debt 0.0 299.2 Depreciation 384.1 393.3 404.3 438.3 638.9 Total Debt Other Income 400.7 737.5 217.8 270.0 295.0 Non Current Liabilities 1972.2 944.5 2154.9 1022.2 EBIT 2047.1 2143.1 1539.9 2069.6 2485.0 TOTAL SOURCES OF FUNDS 14967.8 15968.3 723.6 6893.8 1283.1 21347.2 752.5 11018.8 1344.6 26188.6 782.6 16493.8 1585.1 32645.4 Interest expenses 268.1 -2.9 161.3 257.8 453.0 APPLICATION OF FUNDS Exceptional Items, RRA, JV Profit 204.6 568.7 PBT 1971.5 2127.7 -16.1 1316.0 4.5 1816.3 4.5 2036.4 F.A. 10316.2 LT Loans & Advances Tax 404.7 482.1 RPAT 1566.8 1645.6 326.2 989.8 454.1 1362.2 509.1 1527.3 Other Non Current Assets 68.3 1967.2 Total Non Current Assets 12351.7 Growth (%) 14.6% EPS 4.0 5.0% 4.2 -39.9% 37.6% 12.1% Inventories 49.5 12305.3 79.6 2289.8 14674.7 56.2 16235.0 96.8 2807.4 19139.2 62.7 21296.6 106.5 3232.7 24635.8 81.5 27957.7 117.2 2208.8 30283.7 101.8 2.5 3.5 3.9 Debtors 744.5 521.9 575.0 560.0 530.0 Other Current Assets 474.0 914.6 569.6 1400.9 2074.7 Cash and Cash Equivalents 2335.4 1305.9 2902.0 1504.9 1731.4 Total Current Assets 3603.3 2798.6 4109.3 3547.2 4438.0 Creditors 39.9 45.3 37.2 44.6 35.7 Current Liabilities 947.4 1459.7 1864.1 1950.0 2040.6 Total Current Liabilities 987.3 1505.0 1901.2 1994.6 2076.3 Net Current Assets 2616.1 1293.6 2208.1 1552.7 2361.7 TOTAL APPLICATION OF FUNDS 14967.8 15968.3 21347.2 26188.5 32645.4 10 10 RETAILRESEARCH FRETAILRES#11fundamental ANALYSIS SJVN Ltd HDFC securities 20 Click. Invest. Grow. YEARS Cash Flow Statement (Rs Cr) EBT Depreciation Int & Others Key Ratios FY20 FY21 FY22 FY23E FY24E FY20 FY21 FY22 FY23E FY24E 1971.5 2127.7 1316.0 1816.3 2036.4 PROFITABILITY RATIOS (%) 384.1 393.3 404.3 438.3 638.9 EBITDA Margin 75.1% 72.4% 71.4% 71.0% 70.0% 49.3 -115.4 47.8 167.8 353.0 EBIT Margin 75.7% 86.2% 63.7% 65.7% 61.5% Change in working capital -224.4 -179.2 744.1 -739.8 -581.1 APAT Margin 58.0% 66.2% 41.0% 43.2% 37.8% Tax expenses -466.9 -243.7 -374.4 -424.4 -484.1 RoE 13.0% 12.9% 7.5% 9.9% 10.5% CF from Operating activities (A) 1713.5 1982.7 2137.7 1258.3 1963.1 ROCE 17.5% 19.3% 8.8% 9.4% 9.0% Net Capex -1268.7 -2065.7 -4427.8 -5483.9 -7300.0 Solvency Ratio (x) (Purchase)/Sale of Inv & Others 890.6 Div & int rec 283.4 748.1 173.0 CF from Investing activities (B) -94.7 -1144.6 Borrowings/(Repayments) -112.7 Lease paid -14.2 -3.5 -5.7 -1785.7 81.9 -6131.7 4651.9 -6.4 1033.1 1230.1 Net Debt/EBITDA -0.2 0.5 2.3 4.3 5.2 90.0 -4360.9 100.0 Net D/E 0.2 0.2 0.5 0.8 1.1 -5969.9 PER SHARE DATA (Rs) Dividends and Interest paid -1218.6 -1043.5 -720.1 CF from Financing activities (C) -1345.4 -1052.8 3925.5 4125.0 -4.3 -965.2 3155.5 5475.0 EPS 4.0 4.2 2.5 3.5 3.9 -2.8 CEPS 5.0 5.2 3.5 4.6 5.5 -1239.0 4233.2 DPS 2.2 2.2 1.7 1.8 2.0 BVPS 30.7 32.5 33.5 35.2 37.1 Net Cash Flow (A+B+C) 273.4 -214.7 -68.5 52.9 226.5 Turnover Ratios (days) Debtor days 100.5 76.6 86.8 64.8 47.9 Inventory days 6.7 8.2 9.5 9.4 9.2 5.4 6.7 5.6 5.2 3.2 One Year Price Chart: 38 36 34 32 30 28 26 24 28-10-2021 28-11-2021 11 28-12-2021 28-01-2022 28-02-2022 31-03-2022 30-04-2022 31-05-2022 30-06-2022 31-07-2022 بر 31-08-2022 30-09-2022 (Source: Company, HDFC sec) Creditors days VALUATION P/E (x) P/BV (x) EV/EBITDA (x) 9.0 8.5 14.2 10.3 9.2 1.2 1.1 1.1 1.0 1.0 6.7 8.3 10.4 10.5 10.2 EV/MW (in Cr) 6.5 7.1 8.6 10.2 6.2 Dividend Yield (%) 6.2% 6.2% 4.8% 5.0% 5.6% Dividend Payout (%) 55.2% 52.5% 67.5% 51.9% 51.5% (Source: Company, HDFC sec) NIRMAM ANIL MEHTA Digitally signed by NIRMAM ANIL MEHTA Date: 2022.10.31 09:05:15 +05'30' RETAILRESEARCH FRETAILRES#12fundamental ANALYSIS SJVN Ltd HDFC securities 20 Click. Invest. Grow. YEARS HDFC Sec Retail Research Rating description Green Rating stocks This rating is given to stocks that represent large and established business having track record of decades and good reputation in the industry. They are industry leaders or have significant market share. They have multiple streams of cash flows and/or strong balance sheet to withstand downturn in economic cycle. These stocks offer moderate returns and at the same time are unlikely to suffer severe drawdown in their stock prices. These stocks can be kept as a part of long term portfolio holding, if so desired. This stocks offer low risk and lower reward and are suitable for beginners. They offer stability to the portfolio. Yellow Rating stocks This rating is given to stocks that have strong balance sheet and are from relatively stable industries which are likely to remain relevant for long time and unlikely to be affected much by economic or technological disruptions. These stocks have emerged stronger over time but are yet to reach the level of green rating stocks. They offer medium risk, medium return opportunities. Some of these have the potential to attain green rating over time. Red Rating stocks This rating is given to emerging companies which are riskier than their established peers. Their share price tends to be volatile though they offer high growth potential. They are susceptible to severe downturn in their industry or in overall economy. Management of these companies need to prove their mettle in handling cyclicality of their business. If they are successful in navigating challenges, the market rewards their shareholders with handsome gains; otherwise their stock prices can take a severe beating. Overall these stocks offer high risk high return opportunities. Disclosure: I, Nirmam Mehta, Research Analyst, ACA, authors and the names subscribed to this report, hereby certify that all of the views expressed in this research report accurately reflect our views about the subject issuer(s) or securities. SEBI conducted the inspection and based on their observations have issued advise/warning. The said observations have been complied with. We also certify that no part of our compensation was, is, or will be directly or indirectly related to the specific recommendation(s) or view(s) in this report. Research Analyst or his/her relative or HDFC Securities Ltd. does not have any financial interest in the subject company. Also Research Analyst or his relative or HDFC Securities Ltd. or its Associate may have beneficial ownership of 1% or more in the subject company at the end of the month immediately preceding the date of publication of the Research Report. Further Research Analyst or his relative or HDFC Securities Ltd. or its associate does not have any material conflict of interest. Any holding in stock - No HDFC Securities Limited (HSL) is a SEBI Registered Research Analyst having registration no. INH000002475. Disclaimer: This report has been prepared by HDFC Securities Ltd and is meant for sole use by the recipient and not for circulation. The information and opinions contained herein have been compiled or arrived at, based upon information obtained in good faith from sources believed to be reliable. Such information has not been independently verified and no guaranty, representation of warranty, express or implied, is made as to its accuracy, completeness or correctness. All such information and opinions are subject to change without notice. This document is for information purposes only. Descriptions of any company or companies or their securities mentioned herein are not intended to be complete and this document is not, and should not be construed as an offer or solicitation of an offer, to buy or sell any securities or other financial instruments. This report is not directed to, or intended for display, downloading, printing, reproducing or for distribution to or use by, any person or entity who is a citizen or resident or located in any locality, state, country or other jurisdiction where such distribution, publication, reproduction, availability or use would be contrary to law or regulation or what would subject HSL or its affiliates to any registration or licensing requirement within such jurisdiction. If this report is inadvertently sent or has reached any person in such country, especially, United States of America, the same should be ignored and brought to the attention of the sender. This document may not be reproduced, distributed or published in whole or in part, directly or indirectly, for any purposes or in any manner. Foreign currencies denominated securities, wherever mentioned, are subject to exchange rate fluctuations, which could have an adverse effect on their value or price, or the income derived from them. In addition, investors in securities such as ADRs, the values of which are influenced by foreign currencies effectively assume currency risk. It should not be considered to be taken as an offer to sell or a solicitation to buy any security. HSL may from time to time solicit from, or perform broking, or other services for, any company mentioned in this mail and/or its attachments. HSL and its affiliated company(ies), their directors and employees may; (a) from time to time, have a long or short position in, and buy or sell the securities of the company(ies) mentioned herein or (b) be engaged in any other transaction involving such securities and earn brokerage or other compensation or act as a market maker in the financial instruments of the company(ies) discussed herein or act as an advisor or lender/borrower to such company(ies) or may have any other potential conflict of interests with respect to any recommendation and other related information and opinions. HSL, its directors, analysts or employees do not take any responsibility, financial or otherwise, of the losses or the damages sustained due to the investments made or any action taken on basis of this report, including but not restricted to, fluctuation in the prices of shares and bonds, changes in the currency rates, diminution in the NAVS, reduction in the dividend or income, etc. HSL and other group companies, its directors, associates, employees may have various positions in any of the stocks, securities and financial instruments dealt in the report, or may make sell or purchase or other deals in these securities from time to time or may deal in other securities of the companies/organizations described in this report. HSL or its associates might have managed or co-managed public offering of securities for the subject company or might have been mandated by the subject company for any other assignment in the past twelve months. HSL or its associates might have received any compensation from the companies mentioned in the report during the period preceding twelve months from t date of this report for services in respect of managing or co-managing public offerings, corporate finance, investment banking or merchant banking, brokerage services or other advisory service in a merger or specific transaction in the normal course of business. HSL or its analysts did not receive any compensation or other benefits from the companies mentioned in the report or third party in connection with preparation of the research report. Accordingly, neither HSL nor Research Analysts have any material conflict of interest at the time of publication of this report. Compensation of our Research Analysts is not based on any specific merchant banking, investment banking or brokerage service transactions. HSL may have issued other reports that are inconsistent with and reach different conclusion from the information presented in this report. Research entity has not been engaged in market making activity for the subject company. Research analyst has not served as an officer, director or employee of the subject company. We have not received any compensation/benefits from the subject company or third party in connection with the Research Report. HDFC securities Limited, I Think Techno Campus, Building - B, "Alpha", Office Floor 8, Near Kanjurmarg Station, Opp. Crompton Greaves, Kanjurmarg (East), Mumbai 400 042 Phone: (022) 3075 3400 Fax: (022) 2496 5066 Compliance Officer: Murli V Karkera Email: [email protected] Phone: (022) 3045 3600 HDFC Securities Limited, SEBI Reg. No.: NSE, BSE, MSEI, MCX: INZ000186937; AMFI Reg. No. ARN: 13549; PFRDA Reg. No. POP: 11092018; IRDA Corporate Agent License No.: CA0062; SEBI Research Analyst Reg. No.: INH000002475; SEBI Investment Adviser Reg. No.: INA000011538; CIN U67120MH2000PLC152193 Mutual Funds Investments are subject to market risk. Please read the offer and scheme related documents carefully before investing. 12 112 FRETAILRES RETAILRESEARCH

Download to PowerPoint

Download presentation as an editable powerpoint.

Related

Q4 & FY22 - Investor Presentation image

Q4 & FY22 - Investor Presentation

Financial Services

FY23 Results - Investor Presentation image

FY23 Results - Investor Presentation

Financial Services

Ferocious - Plant Growth Optimizer image

Ferocious - Plant Growth Optimizer

Agriculture

Market Outlook and Operational Insights image

Market Outlook and Operational Insights

Metals and Mining

2023 Investor Presentation image

2023 Investor Presentation

Financial

Leveraging EdTech Across 3 Verticals image

Leveraging EdTech Across 3 Verticals

Technology

Axis 2.0 Digital Banking image

Axis 2.0 Digital Banking

Sustainability & Digital Solutions

Capital One’s acquisition of Discover image

Capital One’s acquisition of Discover

Mergers and Acquisitions