Investor Presentaiton

Made public by

sourced by PitchSend

3 of 18

Creator

PitchSend logo
PitchSend

Category

Pending

Published

Unknown

Slides

Transcriptions

#1The Development and Utilization of Coalbed Methane in Henan Province, China Wang Sipeng Zhengzhou Coal Industry (Group) Co., Ltd.#2Contents 7 Coalbed Methane in Henan 2 3 + Drainage and Utilization of Coalbed Methane in Henan The existing technical problems Challenging the Development and utilization of Coalbed Methane in Henan The future development and utilization of coalbed methane in Henan, China#31. Coalbed Methane in Henan Raw coal output in 2012: 1.48 million tons 7 major coal mining groups and 15 mining areas : Pingdingshan, Zhengzhou, Yima, Jiaozuo, Hebi, Anyang and Yongxia. Coal Seams extracted: 1 which are composed of anthracite and ne mines in Yima highly metamorphic bituminous coal 2) Carrous-Permian coal seam-all the other mines in Henan#4Gas Geological Conditions: Complicated, formed early, undergone multiple tectonic activities widely distributed tectonic coal 河南省煤矿瓦斯地质图 太安 河 北 省 0 西 永請 中 100km 山 西 將發 羊口 行 阳 子袋 造 山 带 东 校址 山 山 豫 斯 瓦 河 带 开封 条二门峡 鄭州 强阳变 偃龙矿区 下侏罗统义马组 低瓦斯矿区 形 图 例 低买新区 矿外拨与瓦斯突出热度-100wk 矿非煤与瓦斯突出强度100-499/次 矿非煤与瓦斯突出強度500-999/次 矿井煤与瓦斯突出張度≥1000/次 微生 無作 鼬探预测区 矿区名称 矿井名称及对应的矿井编号 2 3 4 12:11. 2 又如:药: 楊村. 陳湘矿区3年 北 4 九里山.5 疯马出,d中马村: 食品 ● 煤与瓦斯突出矿井及编号 ●高瓦斯矿井及编号 新安矿区 1 孟津。2 新安.3 义安,在新叉。 版 等度,2大平,3招化.4单位” 15.6 张鸿,7米村。 ::: 宜城 ●低斯矿井及编号 (P)24 7903 白 带北 m 逆 雌 太麻預測含煤区 周口 周口预测区 虞效南预测含媒区 突 光山 商 新县 瓦 斯 鲁西南豫东断 隆低瓦斯带 1.21 中县江 苏 省 省 徐州 省 合肥品 区 带 河南理工大学瓦斯地质研究所:张子敏主编#5Numbers of mines 95 national key mines (excluding mines under construction (807) 712 local ones Registered coal and gas outburst mines: 55 High-gas mines: 22 Characteristics of the coal seams: strongly absorptive with high gas content and high gas saturation#6Main Mines' Coalbed Methane Reserve Mines+ Dengfeng Xinmi+ Yu County Pingdingshan+ Containing Methane Resource area Abundance Resource area Abundance 108m³ km² 10m³/km² 10³m³ km² 108 m³/km²+ Anyang-Hebie 22.93+ 42.9 0.53+ 1324.58 566.0+ 2.21 Jiaozuo+ 20.18+ 40.0 0.50+ 1556.18 709.4+ Yanlong+ 10.22 25.1+ 0.41 224.64 205.4+ Xinggonge 7.46+ 16.8+ 0.44+ 1724.33 875.2+ 22.60+ 57.4+ 0.39 781.89 522.8+ 46.45+ 48.4+ 0.96+ 889.33 367.5+ 37.12 99.7 0.37 929.07 990.4+ 128.18+ 64.8+ 415.2+ Rich in Methane+ Total+ Resource area+ Abundance 10³m³ km². 108m³/km². 1347.51 608.9 2.74+ 2.42+ 1576.36 749.4 2.92+ 1.09 234.86+ 230.5 1.50 1.97 1731.79 892.0 2.41 1.50 804.49+ 580.2+ 1.89 2.42+ 935.78+ 415.9 3.38+ 0.94+ 966.19+ 1090.1+ 1.31+ 1.98 706.4+ 0.99+ 834.58+ 480.0+ 2.97 Coal bearing 117.31 192+ 0.61+ 43.99 120+ 0.37 161.30+ 312+ 0.98+ areas of Taikang Coal bearing 48.39+ 88+ 0.55 13.44 44+ 0.31+ 61.83 132+ 0.86+ areas of Fugou Coal bearing areas of Taikang 87.36 84 1.04 53.66 86 0.62+ 141.02+ 170 1.66#72. Drainage and Utilization of Coalbed Methane in Henan Four key coal mining groups: 1) Henan Coal Chemical Industry Group 2) China Pingmei Shenma Group 3) Yima Coal Industry Group 4) Zhengzhou Coal Industry Group#8Henan Coal Chemical Industry Group Gas drainage mines: 39 Gas drainage stations on the ground: 47 Drainage pumps :186 (drainage capacity of 26081m3/min) Actual gas drainage amount from January to September in 2012 and the utilizing amount · 2.068973× 108m3 7.1146× 107m³. Mines with CMM power plants: 22 Power plants: 26 Total capacity: 49200KW.h#9China Pingmei Shenma Group Preliminarily verified geological resources amount of coalbed methane: 61.663 billion cubic meters (3.332 billion cubic meters consumed and the residual of 58.331 billion cubic meters) average abundance of coalbed methane: 1.56× 108 m³/km². Mines with coalbed methane drainage systems: 22#10Annual coalbed methane drainage: over 110 million cubic meters (concentration from 2% to 30%) Built power plants of low methane concentration from 6% to 25% four power plants with capacity of 4×500KW each A gas storage tank of 5000m3 for life usage of the bathhouse, boiler and canteen cooking at the mine of No.10, consuming CMM of 600 thousand cubic meters#11Others: The geological exploration of No.1 mine of Shoushan power station has been undertaken. And four 4×500KW units have been built in phase I project with the monthly gas utilization from 500 thousand cubic meters to 600 thousand cubic meters.#12Yima Coal Industry Group 13 mines: drainage capacity of 12374m3/min 23 Gas drainage pumps on the ground (flow rate of 150 m3/min to 500m3/min) :the gas drainage capacity of 2900m3/min 67 Gas drainage pumps under the ground (flow rate of 40m3/min to 220m3/min): the gas drainage capacity of 9474m3/min.#13Gas drainage amount and the gas utilizing amount in 2011. 85.05 million cubic meters & 23.16 million cubic meters Mines utilizing the gas: Qianqiu Mine, Gengcun Mine, Xin'an Mine, Yi'an Corporation and Yuxin Corporation. The mines with gas power stations: Qianqiu Mine, Gengcun Mine, Xin'an Mine and Yuxin Corporation. total installing capacities of gas engine: 14×500KW units#14Zhengzhou Coal Industry Group Three 2×500KW gas power stations have been built in the mines of Chaohua, Peigou, Cuimiao and Gaocheng and one set of purification equipment of ventilation air methane (VAM) - cooperation with Sweden, with investment of 35 million RMB Up to the date of October 30, 2012, the projects utilizing gas in Zhengzhou Coal Industry Group has generated electricity of 1200 kwh, at average annual electricity generation is more than 2 million kwh.#153. The existing technical problems Challenging the Development and utilization of Coalbed Methane in Henan 1) The complicated geological structure thatcaused the greatly unbalanced distribution of coalbed methane; 2) The great difficulty of coalbed methane drainage;. 3) The urgent improvement of the coalbed methane drainage equipments 4) The lacking of fund input; 5) The lagging of management construction which hinders the comprehensive utilizing of coal mine methane.#164 The future development and utilization of coalbed methane in Henan, China It is an urgent task to adjust China's energy consumption structure so as to meet the high demands on energy and to face challenge of energy security. The total resource amount of Henan is 879.571 billion cubic meters with overburden depth less than 2000m, the development and utilization of the methane source would be great contributions to energy security in China#17Thank You!

Download to PowerPoint

Download presentation as an editable powerpoint.

Related

Q4 & FY22 - Investor Presentation image

Q4 & FY22 - Investor Presentation

Financial Services

FY23 Results - Investor Presentation image

FY23 Results - Investor Presentation

Financial Services

Ferocious - Plant Growth Optimizer image

Ferocious - Plant Growth Optimizer

Agriculture

Market Outlook and Operational Insights image

Market Outlook and Operational Insights

Metals and Mining

2023 Investor Presentation image

2023 Investor Presentation

Financial

Leveraging EdTech Across 3 Verticals image

Leveraging EdTech Across 3 Verticals

Technology

Axis 2.0 Digital Banking image

Axis 2.0 Digital Banking

Sustainability & Digital Solutions

Capital One’s acquisition of Discover image

Capital One’s acquisition of Discover

Mergers and Acquisitions