#1tangomining Investor Presentation April 2016 Reactivating the BK11 Kimberlite Diamond Mine Orapa/Letlhakane Kimberlite District, Botswana Tango Mining Limited TGV:TSXV - Roadmap to +500,000 carats production BK11 Diamonds 2011 34.579 carats - 6 grainer sawables (Dodecahedral and Octahedral shapes) 1#2Forward Looking Statement tangomining Certain information set forth in this presentation contains "forward-looking statements" and "forward-looking information" under applicable securities laws. Except for statements of historical fact, certain information contained herein constitutes forward-looking statements, which include management's assessment of future plans and operations and are based on current internal expectations, estimates, projections, assumptions and beliefs, which may prove to be incorrect. Some of the forward-looking statements may be identified by words such as "forecasts", estimates", "expects" "anticipates", "believes", "projects", "plans", "outlook", "capacity" and similar expressions. These statements are not guarantees of future performance and undue reliance should not be placed on them. Such forward-looking statements necessarily involve known and unknown risks and uncertainties, which may cause Tango Mining Limited (the "Company") actual performance and financial results in future periods to differ materially from any projections of future performance or results expressed or implied by such forward-looking statements. These risks and uncertainties include, but are not limited to: risks that the presence of economic mineral deposits mentioned nearby the Company's property are not indicative of mineralization on the Company's properties, the supply and demand for, deliveries of and the level and volatility of prices of rough diamonds, risks that the actual revenues will be less than projected; risks that the target production for the existing mining contracts will be less than projected or expected; risks that production will not commence as projected due to delay or inability to receive governmental approval of the Company's acquisition or the timely completion of a National Instrument 43-101 report; technical problems; inability of management to secure sales or third party purchase contracts; currency and interest rate fluctuations; foreign exchange fluctuations and foreign operations; various events which could disrupt operations, including labour stoppages and severe weather conditions; and management's ability to anticipate and manage the foregoing factors and risks. The forward-looking statements and information contained in this presentation and/or website are based on certain assumptions regarding, among other things, future prices for coal and diamonds; future currency and exchange rates; the Company's ability to generate sufficient cash flow from operations and access capital markets to meet its future obligations; coal consumption levels; and the Company's ability to retain qualified staff and equipment in a cost-efficient manner to meet its demand. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The reader is cautioned not to place undue reliance on forward-looking statements. The Company does not undertake to update any of the forward-looking statements contained in this presentation unless required by law. The statements as to the Company's capacity to achieve revenue are no assurance that it will achieve these levels of revenue. TGV.TSXV 2#3Our Board of Directors and Senior Management TGV.TSXV Terry L Tucker (P.Geo) Executive Chairman and Interim CEO tangomining Terry Tucker has over 26 years' experience in mineral exploration and development projects and has served on various executive Boards that include CEO and Director of Nyota Minerals Limited (AIM, ASX: NYO) and President, CEO and Director of TSX-listed Strata Gold Corporation. His current appointment to the Board of Firestone Ventures (TSXV: FV) also supports his role on strategic, operational and corporate matters of Tango. Mr. Tucker holds a B.Sc. Geology degree from the University of Alberta and is a member of the Association of Professional Engineers and Geoscientists of British Columbia. Kevin Gallagher Director Kevin Gallagher has over 40 years' experience in the Southern African mining and metallurgical process engineering industry, at various coal, gold and platinum plants that includes Harmony Gold, Rand Mines Group & Rio Tinto and De Beers. He was also the founder and President of the Kwena Mining Group and is a member of the South African Coal Processing Society, and the Mine Metallurgical Managers Association, holds a Diploma (Hon) Mineral, Processing & Extractive Metallurgy from the School of Mines Rhodesia and completed the Management and Executive Development Program with UNISA and UCT respectively. Antonio Ponte Director Antonio Ponte is a Swiss based financier with 25 years of asset management and mining corporate finance experience in Switzerland and Europe. He is the Chairman and Founder of Raifin SA, a European Mining Finance Consultancy, and in the past has held positions at UBS Switzerland and Citibank Switzerland. Mr. Ponte has been a director and consultant to a number of TSXV companies for a number of years. Devin McKay Chief Operating Officer Devin McKay is a metallurgist with 28 years experience, having worked for Anglo American and De Beers (21 years), Gem Diamonds (3 years), and Centar Limited (4 years). He has worked throughput the mining value chain; exploration, mining, metallurgy, engineering, environmental, finance, strategic planning, and management. Experience includes areas of; operations, R&D, projects, commissioning, mine optimization, feasibility studies, business development, corporate finance, and marketing and sales. He has a National Higher Diploma in Extractive Metallurgy and completed Management Development Program at Gibbs University. Theodor Boshoff General Manager - Plant & Metallurgical Process Engineering Theodor Boshoff has over 11 years diamond mining and processing experience of which 5 years were with De Beers Consolidated Mines at Cullinan, Koffie Fontein, Venetia Mines; AK6 Mothae or Bote ti Mine for Lucara Diamonds; and Metallurgical Project Manager on the Projectio Alto Cuilo for Petra Diamonds; Saurimo Projects and Itengo alluvial projects in Angola. A fellow with the South African institute for Mining and Metallurgy and the Coal processing Society of South African, registered with the Engineering Council of SA and holds an Honors and M.Eng. Metallurgical Engineering (2014) with the University of Pretoria. 3#4Corporate Profile tangomining Tango Mining Limited ("Tango" or the "Company") is an TSXV-listed diamond producer with the producing Oena Diamond Mine in South Africa, an option to acquire and reactivate the past producing BK11 Kimberlite Diamond Mine in Botswana and four thermal coal, metallurgical and processing plant and engineering contracts in South Africa. • African Star holds: . a 100% interest in the Oena Diamond Mine, a producing alluvial diamond mine that has been sold for USD$3M, subject to approvals, to Bothma Diamante CC; Kwena Group holds: • four toll treatment contracts for four coal production collieries located within the Ogies and Highveld coalfields, Mpumalanga Province and Kliprivier coalfield, KwaZulu-Natal Province, South Africa. • BK11 Kimberlite Diamond Mine Option: In July 2015, the Company agreed the purchase the BK11 Mine and production facility in Botswana from Firestone and the minority partner for a total acquisition price of US$8.8M, of which: SHARE STRUCTURE (8.4.2016) Total Issued and Outstanding 142,426,710 42,088,713 (29.55%) • • US$350,000 was paid on 9 July 2015; • US$7,650,000 is payable to Firestone and US$0.8M is payable to the minority partner (US$8.45M total) by 29 July 2016; and • Care and maintenance fees of up to US$40,000 per month are payable on closing. The transaction is subject to Botswana Government approvals and financing. The Company has received unconditional approval from the Competition Authority and has made application to the Minister of Mines. TGV.TSXV Insiders Warrants 25.2.2017 (C$0.10) 4,000,000 Options 7,350,000 Fully Diluted Issued and Outstanding 153,776,710#5South Africa Operations - Locations Oena Diamond Mine Other Alluvial Diamond Mines in the area Major relevant roads Coal Projects Coal fields Forzando Coal Mine Dorstfontein West Coal Mine Dorstfontein East Coal Mine Springlake Coal Mine Namibia Oena Diamond Mine tangomining Zimbabwe Mozambique Waterberg Coal Field Map 4 Botswana Limpopo Baken Oranjemund Alexkor North Map 2 Orange River Alexkor South Kleinzee North Springbok Kleinzee South Northern Cape South Africa TGV.TSXV Atlantic Ocean Pretoria Gauteng Johannesburg North West Free State Bloemfontein Lesotho Eastern Cape Western Cape Cape Town Somerset West Head Office Port Elizabeth East London Mpumalanga eMalahleni (Witbank) Regional Office Ogies Coal Field Swaziland Highveld Coal Field Kliprivier Coal Field KwaZulu-Natal Durban Indian Ocean N 0 100 200 300 400 500 km 5#6South Africa Operations - Kwena Group tangomining 7,286,981 t processed to year end August 2015 (6,500,000 t budget) South Africa based team of 325 skilled engineering and metallurgical skilled persons. Established 1988 - 27 years experience in the precious metal, base metal, thermal coal and diamond industry. Management has a combined >200 years of mine operating and multi stream processing expertise. Service contracts with 4 plants operating with capacity in excess of 12M tpa under management that allows potential increase of revenue base from current 50% utilization to the historical production results. Clients include Exxaro and Glencore. TGV.TSXV 6#7South Africa Operations - African Star tangomining Bulk-sampling Program ongoing and asset sold to Bothma* Oena is a producing alluvial diamond project that operated from 2000 to 2007 and with mine permit renewal and recommenced of operations in 2015. Tango's first diamond tender closed on 28 July 2015 and diamonds were sold at an average of US$2,480/ct, the highest price received was US$6,016/ct and largest stone was 11.39 ct. B30 060 5 Trench mining, Oena July 2015 HITACHI Year to date production results produced an average stone size of 3.28 ct and a grade of 0.278 cpht. NI43-101 resource estimate supports average stone size of 1.22 cts and grade of 0.12 cpht. Life of mine > 15 years. *Tango has entered agreement with Bothma Diamante to acquire 100% of African Star for total consideration of USD$3M subject to approvals in South Africa. TGV.TSXV 7#8Acquisition - BK11 Kimberlite Diamond Mine, Botswana ANGOLA Rundu Andara Damaser NAMBIA Elseb Mamuno Окака Cuando Okavango Delta Katima Mulilo ZAMBIA Kasane Kazungula Livingstone Hwange (Wankle) BOTSWANA Lake National capital. Karb District capital. City International border Road. Intermittent lake Salt pan Swamp 1,000+ meters 500 1,000 meters 50 100 150 km 50 Plumtree 100 mil Bulawayo ZIMBABWE Gwanda Nokaneng Nata Maun Tsau Nata Sehithwa Lake Ngami Rakops Makgadikgadi (salt pans) Orapa Lethakane Francistown Ghanzi BK11 Serull, Moelebi-Phikwe Setophe Serowe Palapye.. Lizzporo Betbridge Messina Tshane Kang Okwa Mahalapye Acts an Pietersburg Potgietersrus Khakhea Werde Molepole Jwaneng Kanye Lobatse Machudi Nylstroom GABORONE Zeerust Molopo Rustenburg Mafikeng Tshabong Bokspits glo PRETORIA Witbank Johannesburg Middelburg SOUTH AFRICA Klerksdorp Vaal Vryburg Bethal Standerton Production Facility (1,34 Mtpa) TGV.TSXV - tangomining BK11 acquisition will transform Tango into a kimberlite diamond producer Acquisition: BK11 Kimberlite Diamond Mine 100% of production plant facility & 100% interest of the mining license (valid to 30 June 2022) Acquisition Price: Firestone Diamonds PLC for US$8.0m & Minority partner 10% interest US$0.8m for total of US$8.8m Historic Capitalized Development Costs to Date: (2012 - US$45m) Pit development US$24m & plant establishment US$21m Tango has: proven technical capability and established operational presence access to sound mining technology to increase performance detailed knowledge of the project and regional operating culture 8#9What we are buying - BK11 Kimberlite Diamond Mine, Botswana 100% of BK11 plant & 100% of mining license from Firestone & minority partner for US$8.8m Waste Dump Soil tangomining The History Discovered in 1974 by De Beers Explored and evaluated by Firestone 2007-2009 Mined by Firestone 2010-2011 Care & maintenance since February 2012 The Property Pit development to 60 m at a cost of US$24M 3.54 km² mining license, granted July 2010 (valid till 2022) Established 250 tph processing plant with 125tph DMS capacity & infrastructure at a cost of US$21M Additional available 15 tph bulk sample & 25 tph evaluation plant and earthmoving equipment available to allow for further district resource development Available deferred tax assets of US$45M Primary crusher Aiher Slimes dam Image 2015 CNES Astrium 2015 Google Scrubbers and scre TGV.TSXV Opencast Pit 5 O/S Dump DMS tailings Scrubbers feed conveyors Scrubbers Cons Check 50 Makes How D at 05 Suske Prat 9#10Calcrete K1 K2U K2L K3 K4 BK11 Geological Model Country Rock Breccia (CRB) Karoo Lavas (LV) Shale (5) LAVA K3 CRB SHALE CRB K2U K2L SHALE K3 CRE WEST/EAST WEST . Accurate geological model created in 2015 (NI 43-101 report dated 15 August 2015) • Total kimberlite pipe volume modelled at 12.5M m³ (22M tonnes) • High resolution ground magnetics, EM and gravity carried out in 2008. • Hinge tangomining Calcrete K1 K2U K2L K3 K4 Country Rock Breccia (CRB) Karoo Lavas (LV) Shale (S) Accurately re-modelled in 2015 - kimberlite surface size of 6.5 ha 1975 (De Beers); > 8 ha 2008 (Firestone); >9.6 ha 2009 (MPH); 8.7 ha 2015 (Tango). Basalt breccia raft identified in 2015 that diluted the mined resource to date. TGV.TSXV EAST 10#11• . • BK11 NI 43-101 Inferred Resource Statement - effective 15.8.2015* tangomining 17.4 million tonnes (Mt) Inferred Resource containing a total of 780,820 carats ("cts") of which approximately 9.0 Mt (Kimberlite Facies K2U, K2L and K3) averages 6.8 cts per hundred tonnes ("cpht") for a total of 608 000 cts, with higher-grade areas being identified at 9.8 cpht. BK11 contains good quality white diamonds in the top 10% of global gem diamond production in terms of value per ct. The recovery of a 1.5 ct high quality Type lla D colour diamond is significant as it indicates the presence of top quality stones within the BK11 kimberlite, with the potential for large +100 ct stones. Based on the 2015 market, diamond valuation experts advise price of US$260/ct and an upside price of US$285/ct. Av. Facies Code Confidence Level MPH wt. av Grade (cpht) Volume SG Tonnes (m³) Tonnes (Rnd Dwn) Carats Dilution % 1.5 ct high quality Type BK11 Kimberlite Pipe facies (Om to 150m bgl) lla D colour diamond C K1 Inferred Resource Inferred Resource 1.11 683,954 2.48 K2U K2L K3 Inferred Resource Inferred Resource Inferred Resource 5.79 K4 Inferred Resource 3.00 CRB Inferred Resource 2.00 Total 1 4.49 2.34 146,594 2.05 8.23 1,072,124 2.05 9.76 378,148 2.04 2,776,319 227 512,752 2.29 2,117,137 2.35 7,687,028 2.27 1,696,207 1,690,000 18,801 17 300,517 300,000 7,010 27 2,197,853 2,190,000 180,285 27 771,423 770,000 75,180 15 6,302 244 6,300,000 365,010 74 1,174,202 1,170,000 35,134 68 4,975,272 4,970,000 99,400 88 17,417,719 17,390,000 780,820 *see News Release dated 24.8.2015 TGV.TSXV 13.7 ct diamond 11#12What went wrong and how can we do it differently? Focus: Improve process recovery rate to >95% ◉ Cut 2 pit extension to access high grade material 1 ■ Optimize newly installed secondary crushing circuit Implement an autogenous milling circuit to improve diamond liberation Result: Improved quality, less diamond damage and size distribution of stones unlocking higher pricing potential (Nov 2011: stones > 2 ct sold for $ 1200/ct) tangomining Focus: ☐ Improve cost efficiency to below US$11/t levels Tie in installed grid power to replace diesel generator power system ◉ Support outsource model on mine face extraction ◉ Utilize deferred tax assets US$45M 2 ■ Autogenous milling can reduce operating cost and increase throughout Result: Improve on historical cost to US$10.20/t estimate November 2011: 2 ct stones recovered of high color and quality @ $1,200/ct Current Pit BK11 East 食 N Cut 2 Extension 3 Focus: ■ Extend life of mine to > 10 years Access additional Orapa kimberlite targets through presence and local influence Improve resource confidence through mining activities waste stripping estimate 926,719t TGV.TSXV 12#13Autogenous milling deemed to be a low risk investment with highest return wrt. extending life of mine and diamond liberation tangomining What Tango will do differently to get recovery from historical 20-30% to >95% and why the previous operators were not able to achieve these results - implement autogenous milling Autogenous Milling will improve recovery and revenue " ☐ Build during mid 2016, start up mid 2017. Build 200tph mill as separate installation in 11-12 months from placing of order then retrofit to plant. Mill will be 5.5m diameter, 3.1m effective grinding length with a 750kW motor. Maximize use of current equipment (Primary gyratory crushers, secondary crusher, DMS etc), infrastructure and amenities (Power and water) Quotation from RSA engineering company for 200tph mill including silo and screen is ZAR50M(US$4M) and with contingency estimate is US$5M. TGV.TSXV 13#14BK11 NI 43-101 Preliminary Economic Assessment (PEA) - effective 12.10.2015 NI43-101 PEA Results (0 - 143 m) POST TAX DISCOUNTED NPV (excluding acquisition costs and 8% discount) US$40M tangomining TGV.TSXV IRR (including acquisition costs) Development CAPEX (including autogenous mill) 43% US $15M Resource Statement Kimberlite pipe area hectares Indicated tonnes Inferred tonnes Life of Mine Mining and Process Ore processed capacity (tpa) Carats (cts) produced life of mine Plant feed grade Strip Ratio Costs US$/t processed 8.7 nil 17.4 million (780,820 ct) @ 4.49 cpht 7 years 1.4 million 569,610 (90,000 per annum) 6.31 cpht 0.86 US $10.20/t Revenues Gross LOM Revenue August 2015 Diamond price US$/ct USS/tonne Operating margin (US$/t) US $188M US $260 US $20.80/t US $10.60/t 14#15BK11 NI 43-101 Preliminary Economic Assessment (PEA) – effective 12.10.2015 tangomining BK11 Project Basecase (Real) Ore mined Tons Waste mined Tons Grade cpht Carat Price $/ct Production cts 2017 2018 2019 2020 2021 2022 2023 9'041'692 7'459'473 1'225'003 569'610 2'544'812 6.24 281 76'453 1'400'004 1'268'654 7.24 297 101'357 1'400'004 2'331'826 6.47 315 90'612 1'400'004 486'753 6.62 334 92'724 1'400'004 384'190 6.34 354 88'776 1'400'004 351'756 816'669 91'482 6.47 3.56 375 90'600 398 29'088 Revenue Costs $ $/T Mining 197'973'469 22'698'059 31'668'646 30'089'244 32'470'619 32'919'722 35'426'768 12'700'411 19 23 21 23 24 25 16 Plant Overheads Total Costs Royalty Tango Overheads 13'258'837 2'438'922 140'080 1'743'021 10'369'463 3'122'296 101'585'850 18'807'841 17'580'860 2'149'235 192'110 2'263'319 15'947'188 3'015'931 13'220'767 3'122'296 192'110 2'263'319 18'798'492 2'853'941 8'272'496 3'122'296 192'110 2'263'319 13'850'221 3'098'185 7'997'434 3'122'296 192'110 2'263'319 13'575'159 3'144'246 7'910'449 3'122'296 192'110 2'263'319 4'309'474 2'370'809 128'073 1'537'398 13'488'175 8'345'755 3'401'379 1'144'924 EBITDA 77'579'778 2'967'964 12'705'527 8'436'811 15'522'214 16'200'317 18'537'214 3'209'732 EBIT 60'375'599 2'967'964 12'705'527 8'436'811 15'057'236 10'620'583 12'957'480 -2'370'002 Tax 2'109'110 2'576'467 Free Cashflow 57'311'273 Discounted 8% -10'351'712 -9'584'918 12'773'492 8'414'061 15'539'277 16'204'750 10'951'211 6'679'353 11'421'832 11'028'681 16'462'776 10'374'341 -1'731'371 -1'010'238 Project NPV Project IRR US$ 39'860'261 43% TGV.TSXV 15#16Budgets Acquisition Costs Balance due 29 July 2016 to Firestone Balance due 29 July 2016 to Minority Partner Subtotal Capital Summary tangomining US$ US$ US$ $7,650,000 $800,000 $8,450,000 Mining and mining equipment - prestripping $2,900,000 Processing Plant Refit (including autogenous mill) $6,840,000 EPCM, Grid power, water delivery, storage, site infrastructure Contingency On Capital (25%) $1,750,000 $2,910,000 Care & Maintenance fees to 29 July 2016 and report costs $600,000 Subtotal $15,000,000 Working Capital including fees $6,283,000 $6,283,000 Subtotal TOTAL $21,283,000 $29,733,000 Financing 1. Completion by 29 July 2016 (or 29 August 2016) USD$30M Secured Credit Facility Loan Disclosure Agreement announced 24.3.2016 for US$30M with Vanderbilt Commercial Lending, Inc, California. TGV.TSXV 16#17• Botswana, southern Africa - Why Botswana? Second largest diamond producing country in the world tangomining Damtshaa, Letlhakane and Orapa are operated by Debswana as well as four shareholder owned diamond mines: Gem Diamonds, Firestone (care and maintenance), Lucara and Kimberley Diamonds (recommissioning). Stable, mining friendly environment Botswana is rated by the Fraser Institute as the best country in Africa and 26 of 122 in the investment attractive index for mining. The fiscal regime for mining: • Mineral Royalty Rates: 10% for precious stones; (calculated from the gross market value of sales at the "mine gate"); Income Tax Rate: diamond tax regime is negotiated; Capital allowances: 100% depreciation of capital expenditures; Allowable losses: Unlimited carry forward of tax losses; Import Duty: Mining equipment and spares are zero-rated, otherwise duties are payable; Value Added Tax: 12% applies to all but zero-rated items, which includes exports of minerals. TGV.TSXV 17#18Contact Information TGV.TSXV Tango Mining Limited, Canada 5626 Larch Street, Suite 202 Vancouver, British Columbia, Canada V6M 4E1 Office Line +1 604 696 4236 www.tangomining.com + Tango Mining Limited, South Africa Witbank Regional Office 205A, 2nd Floor Smokey Mountain Office Park Route N4 Corner Nelson Mandela & Paul Sauer Street Witbank South Africa Representatives: Terry L Tucker, P.Geo., Executive Chairman and Interim CEO [email protected] Office Line: +27 21 853 2185 tangomining www.tangomining.com 18

Download to PowerPoint

Download presentation as an editable powerpoint.

Related

Q4 & FY22 - Investor Presentation image

Q4 & FY22 - Investor Presentation

Financial Services

FY23 Results - Investor Presentation image

FY23 Results - Investor Presentation

Financial Services

Ferocious - Plant Growth Optimizer image

Ferocious - Plant Growth Optimizer

Agriculture

Market Outlook and Operational Insights image

Market Outlook and Operational Insights

Metals and Mining

2023 Investor Presentation image

2023 Investor Presentation

Financial

Leveraging EdTech Across 3 Verticals image

Leveraging EdTech Across 3 Verticals

Technology

Axis 2.0 Digital Banking image

Axis 2.0 Digital Banking

Sustainability & Digital Solutions

Capital One’s acquisition of Discover image

Capital One’s acquisition of Discover

Mergers and Acquisitions