Investor Presentaiton

Made public by

sourced by PitchSend

1 of 39

Creator

PitchSend logo
PitchSend

Category

Pending

Published

Unknown

Slides

Transcriptions

#1Track Work Line 7, MMRDA Mumbai Metro D IT Cem Commitment, Reliability & Quality Myanmar Adani Yangon International Terminal Investors Presentation December 2020 Page 1#2Caution regarding forward-looking statements (Disclaimer) This Presentation is for general information only and may contain statements about expected future events and financial and operating results of ITD Cementation India Limited, which could be forward-looking. By their nature, forward-looking statements require the Company to make assumptions and are subject to inherent risks and uncertainties. There is significant risk that the assumptions, predictions and other forward-looking statements may not prove to be accurate. Readers are cautioned not to place undue reliance on forward-looking statements as a number of factors could cause assumptions, actual future results and events to differ materially from those expressed in the forward-looking statements. Accordingly, this Presentation is subject to the disclaimer and qualified in its entirety by the assumptions, qualifications and risk factors referred to in this document. This does not purport to be a record of the proceedings of the Analysts & Institutional Investors Conference Call. No part of the Presentation shall be copied or disseminated, in whole or in part, in any manner. Page 2#3Contents Executive Summary Corporate Profile & Shareholding Structure Corporate Vision & Mission Corporate Structure Parent Profile Financial Performance Order Book Analysis Operations & Management Page 3#4Executive Summary NAME INDUSTRY GROUP BUSINESS AREAS ITD Cementation India Limited ("ITD Cem") Infrastructure Urban Infra/MRTS, Marine structures, Hydro/Tunnels/Irrigation projects, Airports, Highways/Bridges & Flyovers, Water & waste water, Industrial structures/Buildings, Specialist foundation engineering AUTHORISED CAPITAL AUDITORS INR 750 million Walker Chandiok & Co LLP SHARE PRICE (1 year) NUMBER OF SHARES MARKET CAPITALIZATION High: INR 81 Low: INR 26 171,787,584 INR 12,712 million @ INR 74/share (as on 12 February 2021) Page 4#5Company Profile & Shareholding Structure Ownership Details: Italian-Thai Development Company Limited ("ITD"), the Promoter of the Company, holds 46.64% in ITD Cem. Engaged in the business areas of Urban Infra/MRTS, Marine Structures, Hydro/Tunnel/Irrigation projects, Airports, Highways/Bridges & Flyovers, Water & Waste Water segment, Industrial Structures/Buildings and Specialist Foundation & Engineering projects. Order book of INR 120,321 million as on December 31, 2020 executable over a period of approximately 36 months. Only construction company with a sustained presence in India with MNC parentage. Pedigree of strong management systems and strong recall among clients. Employee strength 2,058 (permanent). Only MNC controlled construction company which is listed on Indian Stock Exchanges with a market capitalization of INR 12,712 million (as on 12 February 2021). Promoters 46.64% As on 31 December 2020 Public 21.09%, Bodies Corporate 1.09% Total institutions 31.18% Page 5#6Vision & Mission Vision Our aim is a satisfied client, a strong and proactive workforce and quality product finished on time and to budget Mission • To make ITD Cem the country's leading construction Company in customer choice, quality and safety Page 6#7Corporate Structure ITD Cementation India Limited Engaged in projects of urban Infra/MRTS, marine structures, hydro / tunnel irrigation projects, airports, highways/bridges & flyovers, water & waste water segment, industrial structures/buildings and specialist foundation engineering projects 100% ITD Cementation Projects India Ltd. Subsidiary 80% ITD Cemindia JV Construction of road projects, Water supply & MRTS 49% ITD-ITD Cem JV Construction of MRTS and Water projects 40% ITD-ITD Cem JV (Consortium of ITD- ITD Cementation) Construction of integrated passenger terminal building at Netaji Subash Chandra Bose International airport 95% ITD Cem Maytas Consortium Design and execution of water conveyor system 60% CEC-ITD Cem- TPL JV Design and construction of underground section including 3 underground stations for Mumbai Metro Page 7#8Joint Ventures Shareholders Key projects Work in Hand as ITD-ITDCem JV ITD Cem-49% ITD (Thailand) - 51% Supply and installation of track work for Bangalore Metro work virtually completed ➤3 under ground stations and tunnels for Kolkata Metro ➤Design and construction of elevated viaduct and 8 elevated stations under Delhi MRTS Project for DMRCL (CC26) ➤Design and Construction of Tunnels by Shield TBM under Delhi MRTS Project for DMRCL (CC32) Laying of Water Trunk Main and Laying of Sewer Line by Micro tunneling Method for Kolkata Environmental Improvement Investment Programme Kolkata ➤Laying of Trunk Sewer along James Long Sarani, Kolkata by Micro tunneling Method 4,147 million ITD-ITDCem JV (Consortium of ITD-ITD Cementation) ITD Cem-40% ITD (Thailand) - 60% ➤Construction of integrated passenger terminal building at Netaji Subhas Chandra Bose International Airport in Kolkata ITD Cem ITD Maytas Consortium ITD Cem-95% Maytas-5% ➤ Investigation, Design and execution of water conveyor system consisting of lined gravity canal, CM & CD works tunnels with carrying capacity of 87.21 cumecs from Thipparam Reservoir Gundureddipalli. for Government of Andhra Pradesh Cemindia JV CEC-ITD Cem-TPL JV ITD Cem - 80% ITD (Thailand) 20% Rehabilitation and - Refurbishment of Water Works at Palta and Garden Reach.(KEIIP), Kolkata ➤ 4 Nos. projects Construction of to elevated structures (viaduct & stations) for Bangalore Metro Rail Ltd. Corporation CEC - - 40% ITD Cem -40%, TPL 20% Design and construction of underground section including 3 underground for stations Mumbai Metro Rail Corporation Limited Nil 7,391 million 5,622 million 9,526 million on December 31, 2020 (INR) (100%)#9Industry Position Leadership position in marine construction, foundation and specialist works and significant presence in MRTS, Hydro / Dams/Tunnels / Irrigation and transportation segments Several quality and safety awards in the past 15 years a reflection of ITD Cem's drive towards excellence One of the few construction companies to conform to ISO standards "ISO 45001:2018, ISO 9001:2015, ISO 14001:2015" for Quality Management Systems, Occupational Health and Safety Management System and Environmental Management System. Key clientele includes: Government/PSU: DMRC, RVNL, Kolkata Metro Rail Corporation, SAIL, Bangalore Metro Rail Corporation, NHAI, Mazagaon Dock Ltd., Garden Reach Shipbuilders, Airport Authority of India, Indian Railways, Govt. of Telangana, Rites Ltd., CPWD, Noida, Mumbai Port Trust, Nagpur Metro Rail Corporation, Mumbai Metro Rail Corporation, Ennore Port Ltd, Nuclear Power Corporation, Kolkata High Court, Inland Waterways of India, Tamil Nadu Generation and Distribution Corporation, MMRDA, IRCON, Tangedco Private: Reliance - ADAG group, IHI Corporation, Nhava Sheva Gateway Terminal, Tata Power, PSA (Singapore), DP World, Adani Group, China Kun Lun Contracting & Engineering Corporation, Jindal Steel, Samsung, Tata Power, RIL, L&T, Jindal Power, Mundra Port Trust, Gangavaram Port Ltd., Howe Engineering etc. ARABIAN SEA IND AN * INDIA BAY OF BENGAL * Permanent office Area office Key Project office Marine project at Yangon - Myanmar N Page 9#10International Parent Strength Italian-Thai Development Company Limited is one of the leading Infrastructure companies the largest construction company in Thailand and have made major contribution to Thailand's infrastructure for over 60 years. Listed on the stock exchange of Thailand in 1994 with an initial capital base of Baht 2 million In 1985, ITD received the Royal Seal of Garuda, the highest and most honorable achievement for civilian companies in Thailand Net worth INR 38,264 million (Consolidated) as at 31 December 2019 Work in hand (Construction & Concession) INR 9,19,884 million (Construction INR 5,60,514 million) as on 26th November 2020. Projects with lowest bid / Under negotiation INR 53,669 million. ITD has expanded to overseas countries such as India, Bangladesh, Cambodia, Lao Pdr, Indonesia, Maldives, Myanmar, Philippines, Madagascar, Taiwan, etc. With their experience and expertise, we have today. successfully maintained our position as one of the market leaders in India's infrastrucutre development programme. This MNC lineage also provides access to the latest technology and know-how, international design and engineering organisation as well as skilled personnel to augment our local strength. * 1 Baht Rs. 2.43 Page 10#11Standalone Financials Yearly Revenue from operation INR in Millions Quarterly Revenue from operation 35,000 7,000 30,000 6,000 25,000 5,000 20,000 4,000 15,000 3,000 10,000 2,000 5,000 1,000 0 FY15 FY16 FY17 Revenue 27,435 28,716 18,729 15M Mar'19 22,835 0 FY20 Dec'19 Mar'20 Jun'20 Sep'20 Dec'20 Revenue 5,190 5,570 2,879 4,584 6,555 21,420 Yearly EBITDA 3,500 3,000 2,500 2,000 1,500 1,000 Quarterly EBITDA 18.0% 900 16.0% 16.0% 800 14.0% 14.0% 700 12.0% 12.0% 600 10.0% 500 10.0% 8.0% 400 8.0% 6.0% 300 6.0% 4.0% 200 4.0% 500 100 2.0% 2.0% 0.0% 0 0.0% FY15 FY16 FY17 15M Mar'19 FY20 (100) (200) -2.0% -4.0% EBITDA 1,751" 2,155 * 2,869 2,818 2,649* 785* (%) 6.4% 7.5% 15.3% 12.3% 12.4% (%) 220 (87) 10.9% 14.1% 7.6% -1.9% Dec'19 Mar 20 Jun'20 Sep'20 Dec'20 EBITDA 563 846 12.9% * Before exceptional item Page 11#12Standalone Financials Yearly PAT & EPS INR in Millions Quarterly PAT & EPS 900 6.0 400 600 300 0 דזווד 200.0% 5.0 300 4.0 3.0 200 100.0% 2.0 100 0.0% 1.0 0 -100 -300 (1.0) -100.0% (2.0) -200 -600 (3.0 -300 -200.0% (4.0) -400 -900 (5.0) -300.0% -500 15M FY15 FY16 FY17 FY20 -600 -400.0% Mar'19 PAT -593* 481 709 807 400* PAT 88 PAT (%) (2.2) 1.7 3.8 1.9 EPS (3.8) 3.1 4.7 4.8 2.5 PAT (%) 1.7% EPS 0.6 Dec 19 Mar'20 Jun'20 Sep'20 Dec'20 -65 306 -1.2% -5.6% -11.1% 4.7% (0.3) (1.0) (2.9) 1.8 -162* -508 * * After exceptional item After exceptional item Debt as at Net Worth as at 12,000 14.0 6,000 0.9 12.0 0.8 10,000 10.0 4,500 0.7 8.0 0.6 8,000 6.0 0.5 3,000 6,000 4.0 0.4 2.0 0.3 4,000 1,500 0.2 0.1 2,000 (2.0) 0 (4.0) Dec'16 Dec'17 Mar'19 Mar'20 Dec'20 0 (6.0) Dec' Dec' Mar' Mar' Dec' Debt 3,562 4,886 2,203 2,931 4,177 16 D/E Ratio 0.6 0.8 0.2 0.3 0.4 Net worth 5,507 Net D/E Ratio 0.3 0.6 0.1 0.1 0.3 -ROE (%) 9.1 17 6,173 12.1 20 19 10,209 10,526 10,111 20 9.9 3.9 (3.5) Page 12#13Consolidated Financials (Figures for the year 2015 are as per IGAAP and year 2016 onwards are as per Ind AS) Yearly Revenue from operation INR in Millions Quarterly Revenue from operation 35,000 30,000 10,000 8,000 25,000 20,000 6,000 15,000 4,000 10,000 5,000 2,000 0 FY15 FY16 FY17 Revenue 30,709 30,896 20,605 15M Mar'19 31,651 28,607 0 FY20 Revenue Dec'19 Mar'20 Jun'20 7,073 7,396 3,994 Sept 20 Dec 20 5,527 7,917 Yearly EBITDA Quarterly EBITDA 4,000 16.0% 1,050 900 14.0% 3,500 14.0% 3,000 12.0% 750 2,500 10.0% 600 2,000 8.0% 1,500 6.0% 450 1,000 4.0% 300 500 2.0% 150 0 0.0% M 12.0% 10.0% 8.0% 6.0% 4.0% 2.0% FY15 FY16 FY17 15M Mar'19 0 0.0% FY20 Dec'19 Mar 20 Jun'20 Sept'20 Dec'20 * * EBITDA EBITDA 2,138 (%) 2,345 2,929 7.0% 7.6% 14.2% 3,413 3,280 10.8% 11.5% (%) 719 10.2% 347 949* 12.8% 8.7% 0.8% 11.8% 46 932 * Before exceptional item Page 13#14Consolidated Financials (Figures for the years 2015 are as per IGAAP and year 2016 onwards are as per Ind AS) Yearly PAT & EPS INR in Millions Quarterly PAT & EPS 900 6.0 400 200.0% 5.0 600 300 4.0 3.0 200 100.0% 300 2.0 100 0.0% 0 1.0 -300 (1.0) (100) -100.0% (2.0 (200) -600 (3.0) (300) -200.0% (4.0 -900 (400) (5.0) -300.0% 15M (500) FY15 FY16 FY17 FY20 (600) -400.0% Mar'19 Dec' 19 Mar 20 Jun'20 Sep'20 Dec'20 PAT -593* 481 710 819 406* PAT PAT (%) (1.9) 1.6 3.4 2.6 1.4 91 PAT (%) 1.3% EPS (3.8) 3.1 4.7 4.8 2.5 EPS 0.6 (65) (162)* (508) -0.9% -4.1% -9.2% (0.3) (1.0) (2.9) 306 3.9% 1.8 * After exceptional item Debt as at Net Worth as at 12,000 14.0 6,000 0.9 0.8 10,000 12.0 0.7 10.0 0.6 8,000 0.5 8.0 4,500 0.4 6,000 6.0 0.3 0.2 4,000 4.0 0.1 2,000 3,000 2.0 Dec'16 Dec'17 Mar'19 Mar'20 Dec'20 0 Debt 4,630 4,886 5,323 4,739 5,223 D/E Ratio 0.8 0.8 0.5 0.4 0.5 Net D/E Ratio 0.5 0.6 0.4 0.2 0.3 Dec'16 Net worth 5,528 ROE (%) 9.4 Dec 17 Mar'19 Mar'20 Dec'20 6,182 10,230 10,554 10,140 12.1 10.0 3.9 3.0 Page 14#15Order Book Analysis Page 15#16Order Book and Sector Breakup INR in Millions Order book as at year end As on December 31, 2020 Size No. (Major) % 117,431 Urban Infrastructure / MRTS / Airports 41,931 17 34.8% 99,925 Marine 40,130 14 33.4% 75,132 Hydro/Dams / Tunnels / 22,134 9 18.4% 65,835 Irrigation 52,043 Industrial structures & 9,978 1 8.3% Buildings Highways, bridges & flyovers 2,230 2 1.9% Water & Waste Water 2,092 4 1.7% Dec'15 Dec'16 Dec'17 Mar'19 Mar'20 Foundation & Specialist Engineering 1,826 15 1.5% Order book as at qtr. end Total 1,20,321 61 100% 126,601 120,321 119,160 117,431 113,357 Dec'19 Mar'20 Jun'20 Sep'20 Dec'20 Government 14% 49% PSU's Private 37% Page 16#17Order Book: Sector Breakup Order book of INR 120,321 million as on December 31, 2020. Major ongoing projects included in the order book are: * Design and construction of underground section including 3 underground stations for Mumbai Metro worth 28,301 million (our share 16,981 @ 60%). Design & Construction of underground structures, Bangalore Metro worth INR 17,713 million Coal Jetty, Breakwater and Conveyor System for Udangudi Supercritical Thermal Power Project worth 17,182 million Construction of Piers, Landside Tunnels and Buildings, Seabird, Karwar worth 11,425 million Redevelopment of General Pool Residential colony at Kasturba Nagar (Phase-I), New Delhi worth 11,280 million 4 Nos. projects of Elevated structures (viaduct & stations) for Bangalore Metro worth 23,702 mn Construction of Tunnels (3 pkgs.) on Sivok (West Bengal) to Rangpo (Sikkim) New Single line BG Railway Line Project worth 6,167 million, 4,948 million & 3,038 million respectively. Up-gradation of Passenger Terminal New Building-Trichy Airport worth 5,648 million Container Terminal, Yangon, Myanmar worth INR 5,635 million UG Metro Station KBB, Metro Railway, Kolkata worth 4,689 million Construction of Rubble Mound Breakwater for Port terminal at Vizhinjam worth INR 4,111 million New Integrated Terminal Building, at Pune Airport worth 3,589 million Construction of Bulk Berth and Approach Trestle at Chhara Port worth 3,250 million 8 Nos. Elevated Metro Stations for Nagpur Metro worth 3,103 million Construction of 7 stations incl. all related works of New Garia-Airport Metro Project, Kolkata, West Bengal worth INR 2,926 million Development of Refit Jetty and Allied Facilities at Port Blair worth 2,803 million Construction of sewer tunnel from Jai Bharat pumping station to Bandra IPS for MCGM Mumbai worth INR 2,563 million Steel Bridge over river Ganga at Allahabad between Jhusi and Daraganj Station, Uttar Pradesh worth INR 2,499 million * above amounts are contract values as awarded Page 17#18Order Book: Sector Breakup Rs. mn Major Projects secured during qtr. December 2020: Construction of Piers, Landside Tunnels and Buildings including Cranes and Mechanical, Electrical & Plumbing (MEP) services, Project Seabird, Karwar, Karnataka worth INR 11,425 million Major Projects secured after 31 December 2020 (not included in order book) Construction of Circuit Bench of Calcutta High Court at Jalpaiguri worth INR 3,769 million Construction of Substructure from Abutment No.1 to Pier No 76, approach embankment and retaining wall, Pamban Bridge, RVNL, Pamban, TN worth 1,537 million LOI awaited (not included in order book) Development of Third Chemical Berth At Pir Pau, Mumbai Port Trust worth INR 1,120 million Page 18#19Operations & Management Page 19#20Business Operations Urban Infrastructure / MRTS / Airport: Increasing Focus ▸ Scope: Construction of Mass Rapid Transport Systems and Airports (integrated passenger terminals and allied services) ▸ Key Projects Executed: ▸ Under ground Tunnels, Viaduct, Stations and Track works for Delhi Metro, Kolkata Metro, Jaipur Metro, Bangalore Metro and Chennai Metro ▸ Construction of Integrated Passenger Terminal Building at NSCBI Airport, Kolkata Major Projects under Execution: ▸ Projects of Bangalore Metro, Kolkata Metro, Mumbai Metro and Nagpur Metro ‣ Up-gradation of Passenger Terminal New Building -Trichy ▸ New Integrated Terminal Building, Reconstruction of Old Terminal Building at Pune Airport ▸ Order Book: Outstanding order book of INR 41,931 million as on December 31, 2020 Page 20#21Urban Infrastructure / MRTS / Airports: Increasing Focus - contd.. Maha Metro Cantilever Bridge Nagpur Trichy Airport Project Bangalore Elevated Metro Project Pune Airport Maharashtra Page 21#22Business Operations Marine: Market Leadership Position Scope: EPC services for marine structures including: ...(2) Construction of jetties, dolphins and service platforms, quay, berths on concrete and steel piles as well as sold gravity type wharf structures Construction of Construction of ship lift, dry dock, wet basin and inclined berth Building of jetties for handling liquid and solid cargo, wharfs, berths and quays for handling of containers Key Projects Executed: ་ Dock modernization project at Mazagon docks Design and Construction of Wharf Structure at Nhava Sheva (India) Gateway Terminal, JNPT Dredging and reclamation works for development of 4th container terminal in Jawaharlal Nehru Port (JNP)-Phase-I Major Projects under Execution: Coal Jetty, Breakwater and Conveyor System for Udangudi Supercritical Thermal Power Project Construction of Multi Modal IWT terminal for Haldia- West Bengal Improving the Capacity Utilization of OR-I & OR-II Berths for Visakhapatnam Port Trust Development of Refit Jetty and Allied Facilities at Port Blair Construction of Break water at Vizhinjam Port Development of Liquid Cargo Jetty at JNPT through EPC Construction of Bulk Berth and Approach Trestle at Chhara Port Development of Container Terminal - Myanmar Rock Breakwater, Howe,Vizhinjam-Kerala Construction of Piers, Landside Tunnels and Buildings, Project Seabird, Karwar Order Book: Outstanding order book of INR 40,130 million as on December 31, 2020 Page 22#23Marine: Market Leadership Position - contd.. Chhara Port, Gujarat 1777 Udangudi TANGEDCO, Coal Jetty, Tamil Nadu Vizag Port ANDAMAN LAKSHADWEEP HARBOUR WORKS, PORT BLAIR --- Page 23#24Marine: Market Leadership Position - contd.. Myanmar Adani Yangon International Terminal Myanmar Page 24#25Business Operations Hydro/Dams / Tunnels / Irrigation : Scope: Construction of concrete, earth fill and rock fill dams and tunnels Key Projects Executed: ...(4) Diversified into construction of hydro projects by undertaking 150 MW pumped storage plant near Mumbai for Tata Power Laying of Water Trunk Main from Garden Reach Water Works to Taratala Valve Station and Laying of Sewer Line along Diamond Harbour Road by Microtunelling Method for KEIIP Projects under Execution: Investigation Design and execution of water conveyor system consisting of lined gravity canal, CM & CD works tunnels for Telangana Government Laying of Trunk Sewer along James Long Sarani by Microtunneling Method, Kolkata Development of S&D Network in Churial Extension Canal sub basin including laying of main trunk sewer by micro tunneling method and construction of Churial Extension Pumping Station for KEIIP. Providing and Laying Sewage Trunk main by Micro Tunnelling Method on Ashram Road from Wadaj Circle to Existing RCC Box on Riverfront of AMC Area for Ahmedabad Municipal Corporation Construction Of Adits 6 in Connection With New Single Broad Guage Rail Link Between Rishikesh And Karanprayag - Uttarakhand Construction of Tunnels (T9-T10, T-3, T-4 & T-6) on Sivok (West Bengal) to Rangpo (Sikkim) New Single line BG Railway Line Project Order Book: Outstanding order book of INR 22,134 million as on December 31, 2020 Page 25#26Hydro / Dams / Tunnels / Irrigation - contd.. Railway Tunnel Project, Sikkim 2020/11/1 17:41 Railway Tunnel Project, Sikkim 2020/11/2 10:25 Page 26#27Business Operations Industrial Structures & Buildings : ་ ...(6) Scope: Construction of civil structures for academics institutes, residential complexes, refineries, petrochemicals, power, steel and fertilizer plants Potential for high growth Key Project executed: Plant building and offsite facilities at Unchahar for NTPC Haj Tower, Kolkata Construction of Super Structure (G+15) for Unified Academic Campus of Bose Institute, Salt Lake, Kolkata Construction of Different Buildings under phase-I for IIT Ropar at Ropar, Punjab Construction of LNG storage tanks at Mundra Construction of General Civil Works and Building Utilities For 200 KV GIS Building at Mahalaxmi, Mumbai. Architectural Finishing, Plumbing, Tubewell, VAC, Electrical, Fire Fighting Works For 6 Elevated Stations for Kolkata Metro Projects under Execution: Redevelopment of General Pool Residential colony at Kasturba Nagar New Delhi Order Book: Outstanding order book of INR 9,978 million as on December 31, 2020 Page 27#28Industrial Structures & Buildings - contd.. Nagpur Metro Station Building 3330 Tower for Haj Committee Kolkata IOCL, Paradip Page 28#29Business Operations Highways, Bridges & Flyovers: Major Player Scope: Construction of roads, bridges and flyovers Key Projects Executed: ...(5) Completed road projects in Maharashtra, Madhya Pradesh, Andhra Pradesh and Tamil Nadu for NHAI Elevated Road for Noida and PWD Delhi Ghaziabad ROB Railway bridge, Nashik. Projects under Execution: Construction of 6 Laning of Pune Satara Road (NH 4) - Package 1 Steel Bridge over river Ganga at Allahabad, Uttar Pradesh Order Book: Outstanding order book of INR 2,230 million as on December 31, 2020 Page 29#30Highways, Bridges & Flyovers - contd.. Pune Satara Road Project Beyond Dharna Bridge, Nashik Page 30#31Business Operations Water and Waste Water: Increasing Focus ...(7) Scope: Recently diversified into water and waste water segment undertaking projects for water transmission and treatment plants Potential for high growth Key Projects Executed: Limited presence in the segment and increasing focus going forward Water transmission line at Tallah Palta for Kolkata Municipal Corporation Procurement of Ground Water Treatment Plants - Design, Construction, Supply, Installation, Commissioning including Mechanical & Electrical Equipment and Operation in Agartala Projects under Execution: Rehabilitation and Refurbishment of Water Works at Palta and Garden Reach. Designing, Providing, Constructing, Erecting, Testing & Commissioning of Intake Channel, Jackwell, Pump House, Break Pressure Tank and other related works for Bhama Askhed Water Supply Scheme, Pune Drainage System of Agartala Municipal Area / SH: Construction of RCC covered drain in Central zone / Balance work. Construction of sewer tunnel and allied works from Jai Bharat pumping station to Bandra IPS by Segmental Tunneling Method, Mumbai Order Book: Outstanding order book of INR 2,092 million as on December 31, 2020 Page 31#32पुणे महानगरपालिका www sake of gra पंप पूर्व Water & Wastewater Projects Intake Works at Bhama Askhed, Pune R48MP AI QUAD CAMERA Shot by abhi ABMP AL QUA 2020 11:09 1226 hot by abhi Pumping Station at Bhama Askhed, Pune Bhama Water Project, Pune 2020/09/12 10:12#33Water & Wastewater Projects Aerial View of WTP at Rampur, Agartala Clear Water Pumps at Rampur, Agartala Filtration Plant at Rampur, Agartala Page 33#34Business Operations Foundation & Specialist Engineering: Market Leadership Position Scope: Foundation and specialist works ...(3) Services offered include geotechnical investigations, piling, diaphragm walling, sandwicks / band drains, vibrofloatation stone columns / vibro compaction, drilling and grouting, rock / soil anchors, colcrete, gunite / shotcrete, grouted mattress, repairs, tube heading and box pushing Key Projects Executed: Execution of civil works (piling) for 4 x 600 MW O P Jindal Super Thermal Power Plant at Tamnar, Raigarh, Chattisgarh Diaphram wall for Sabarmati Four subways in Chennai through box pushing Piling works for Paradip refinery Piling work of Talwandi 3x660 MW Superficial Thermal Power Plant at Talwandi, Punjab Piling Works for Polypropylene Plant at Indian Oil Corporation Limited, Paradip Refinery, Odisha Major Projects under Execution: Secant Pile wall Works for Mumbai Metro Line -3 Package - 4 at Shitaladevi, Sidhivinayak Station Construction of underpass, Noida, Uttar Pradesh Construction of Diaphragm wall for at FUN REPUBLIC, Lucknow, Uttar Pradesh Construction of Civil foundations and retaining wall for Plot A covered shed at Jaigarh, Maharashtra Drilling & Grouting, Tata Power, Shirawta, Maharashtra Construction of Civil Foundation for MHS for Plot C at Jaigarh, Maharashtra Stone Column and Piling Works on FGD Package for 2 x 500 MW Anpara-D Thermal Power Plant, UP Order Book: Outstanding order book of INR 1,826 million as on December 31, 2020 Page 34#35Foundation & Specialist Engineering Stone Column & Piling Work at Power Plant, Anpara, UP Rehabilitation of Shirawata Dam, Maharashtra NOIDA Underpass Project Drilling for Slope Stability at MRPL, Mangalore Page 35#36TCem Commitment, Reliability & Quality THANK YOU Page 36

Download to PowerPoint

Download presentation as an editable powerpoint.

Related

Q4 & FY22 - Investor Presentation image

Q4 & FY22 - Investor Presentation

Financial Services

FY23 Results - Investor Presentation image

FY23 Results - Investor Presentation

Financial Services

Ferocious - Plant Growth Optimizer image

Ferocious - Plant Growth Optimizer

Agriculture

Market Outlook and Operational Insights image

Market Outlook and Operational Insights

Metals and Mining

2023 Investor Presentation image

2023 Investor Presentation

Financial

Leveraging EdTech Across 3 Verticals image

Leveraging EdTech Across 3 Verticals

Technology

Axis 2.0 Digital Banking image

Axis 2.0 Digital Banking

Sustainability & Digital Solutions

Capital One’s acquisition of Discover image

Capital One’s acquisition of Discover

Mergers and Acquisitions