One Nation, One Grid slide image

One Nation, One Grid

A 1 Compelling Industry Dynamics Low Per Capita Power Consumption and Electrification¹... (kWh/Year for 2011) B I 2,016 9172 ...And India's continued Power Deficits³... D ...Driving Capacity Addition Across Power Sector to Meet Demands ('000 MW) (Capacity additions and expenditure) % Peak Deficit 3,312 109 2,933 FY08 16.6% 2,441 91 India Brazil China World ...Rising Income in India4 (Base year: 2004-05)... XIIth Plan Estimated Generation ✓ Investment requirement: INR 838,700 cr 110 FY09 11.9% 97 ✓ Non-renewable capacity addition of 88GW N 119 FY10 12.7% 104 (INR '000 cr) CAGR: 9,000 7.1% 122 FY11 9.8% 8,000 CAGR: 7.0% 110 7,000 6,000 5,000 3,871 130 FY12 10.6% 116 4,000 3,000 2,000 135 FY13 9.0% 123 1,000 0 07A 08A 09A 10A 11A 12A 13A 14E 15E 16E 17E ■Peak Requirement Demand met Renewable energy capacity addition of 30GW Transmission ✓ Investment requirement: INR 180,000 cr Centre INR 100,000 cr State: INR 55,000 cr Private: INR 25,000 cr ckm addition : 107,440 MVA addition : 270,000 Distribution ✓ Investment requirement: INR 306,235 cr Including INR 9,500 cr for Smart Grid ✓ ckm addition (<33kV): 1,305,000 MVA addition (33/11KV): 138,000 Note: 1. IEA Key World Energy Statistics 2013. 2. Provisional data for the period April 2012 March 2013, CEA. 3. CEA LGBR Report 2013-14, CEA Power Scenario at a Glance November 'ONE NATION, ONE GRID 2012, Report of The Working Group on Power for 12th Plan, 12th Five Year Plan 4. RBI- Handbook of Statistics on Indian Economy 2012-13, IMF- World Economic Outlook Database, October 7 2013 पावरग्रिड
View entire presentation