Corporate Presentation 6M2015 Results slide image

Corporate Presentation 6M2015 Results

Development Projects Project Upgraded Existing Railway Line Bukit Asam Production Infrastructure & CBM Status . Tanjung Enim - Tarahan Port (410km), TE – Kertapati Port (161km) BUKITASAM TRANSPACIFIC RAILWAYS KERETA API PEKERETA APIINDONESIA (PERSERO) BATR - Newly Developed Railway (Bukit Asam • • • • • Transpacific Railway) • · • 100% owned & operated by State Railway Company, PT KAI Capacity of 22.7Mtpa (2015 - 2029) Currently, PT KAI is operating about 2.944 Wagons and 106 Locomotives, including 600 new wagons and 5 new locomotives that arrived in 2014. Tanjung Enim - New Coal Terminal in Lampung (280km) PTBA (10%), Rajawali Asia Resources (80%), China Railway EC (10%) Investment of USD2 Bn, EPC Contract of USD1.3 Bn 18 Nov 2011, Frame Work Agreement funding with China Bank Consortium was signed. Currently in finalization for mining JV Restructuring Project will reach its peak capacity of 25 Mtpa in 4 years Tarahan Port Expansion • Located at the southern tip of Sumatera Island • Coalbed Methane Well Methane (to pipeline) Coal Bed Methane (CBM) Water (discharged) Methane Reduced water pressure • • Newly developed infrastructures for RCD3 & RCD4, Jetty #2 & Shiploader, Additional stockpile of 2x150,000Mt, and Office. Commissioning In June 2015, will be in operation with the new Jetty #2 is able to accomodate the giant 'Capesize' bulkcarrier vessels of upto 210,000DWT. It becomes the largest coal terminal on Sumatera and Indonesia Investment of about USD230 mn • Located in Tanjung Enim Mine . • . Cost Recovery Project between PTBA (27.5%), Pertamina (27.5%), Dart Energy Australia (45%) +40 MMSCF (Million Standard Cubic Feet per Day, with potential reserve of 0.8 Trillion Cubic Feet (TCF) Investment of USD14.48 Mn (for the first three years) Methane released from coal Coal water Submersible pump 15
View entire presentation