Corporate Presentation 6M2015 Results
Development Projects
Project
Upgraded Existing
Railway Line
Bukit Asam
Production Infrastructure & CBM
Status
.
Tanjung Enim - Tarahan Port (410km), TE – Kertapati Port (161km)
BUKITASAM
TRANSPACIFIC
RAILWAYS
KERETA API
PEKERETA APIINDONESIA (PERSERO)
BATR - Newly
Developed Railway
(Bukit Asam
•
•
•
•
•
Transpacific Railway)
•
·
•
100% owned & operated by State Railway Company, PT KAI
Capacity of 22.7Mtpa (2015 - 2029)
Currently, PT KAI is operating about 2.944 Wagons and 106 Locomotives, including 600
new wagons and 5 new locomotives that arrived in 2014.
Tanjung Enim - New Coal Terminal in Lampung (280km)
PTBA (10%), Rajawali Asia Resources (80%), China Railway EC (10%)
Investment of USD2 Bn, EPC Contract of USD1.3 Bn
18 Nov 2011, Frame Work Agreement funding with China Bank Consortium was signed.
Currently in finalization for mining JV Restructuring
Project will reach its peak capacity of 25 Mtpa in 4 years
Tarahan Port Expansion
•
Located at the southern tip of Sumatera Island
•
Coalbed Methane Well
Methane
(to pipeline)
Coal Bed Methane
(CBM)
Water
(discharged)
Methane
Reduced water
pressure
•
•
Newly developed infrastructures for RCD3 & RCD4, Jetty #2 & Shiploader, Additional
stockpile of 2x150,000Mt, and Office.
Commissioning In June 2015, will be in operation with the new Jetty #2 is able to
accomodate the giant 'Capesize' bulkcarrier vessels of upto 210,000DWT.
It becomes the largest coal terminal on Sumatera and Indonesia
Investment of about USD230 mn
• Located in Tanjung Enim Mine
.
•
.
Cost Recovery Project between PTBA (27.5%), Pertamina (27.5%), Dart Energy Australia
(45%)
+40 MMSCF (Million Standard Cubic Feet per Day, with potential reserve of 0.8 Trillion
Cubic Feet (TCF)
Investment of USD14.48 Mn (for the first three years)
Methane
released
from coal
Coal
water
Submersible
pump
15View entire presentation