Investor Presentaiton
Dittmer Project
Moving towards production
Mine restart scoping studies underway:
Preliminary metallurgical test work completed
Mineral resource delineation and analysis in progress
• Infill drilling planned to target high grade zones within ML
Infill Drill Design at Dittmer from Underground
N
7738200mN
7738100mN
7738000mN
7737900mN
About Dittmer
•
Granted Mining Lease
200mRL-
DUFFER LODE
Historic Workings
Dittmer ML 10341
Long Section
Looking East
Current access to underground workings
Available workforce
Nearby toll treatment options
Drilling confirmed orebody within 30m of current access level
Extensive mineralised backfill material (4.0 - 81.7 g/t Au)
Ballymore RESOURCES
100mRL -
OmRL -
0
Drill Intersections-
Gold metre-grams
>30 m-g
20-30 m-g
10-20 m-g
5-10 m-g
1-5m-g
<1 m-g
Planned Hole
DISPLACED
DUFFER LODE
0
Interpreted High Grade Shoot
Interpreted High Grade Shoot
Interpreted
High-Grade
Shoot
Righ
Interpreted High Grade Shoot
0
50m
100m
ASX BMR 12View entire presentation