Investor Presentaiton slide image

Investor Presentaiton

Dittmer Project Moving towards production Mine restart scoping studies underway: Preliminary metallurgical test work completed Mineral resource delineation and analysis in progress • Infill drilling planned to target high grade zones within ML Infill Drill Design at Dittmer from Underground N 7738200mN 7738100mN 7738000mN 7737900mN About Dittmer • Granted Mining Lease 200mRL- DUFFER LODE Historic Workings Dittmer ML 10341 Long Section Looking East Current access to underground workings Available workforce Nearby toll treatment options Drilling confirmed orebody within 30m of current access level Extensive mineralised backfill material (4.0 - 81.7 g/t Au) Ballymore RESOURCES 100mRL - OmRL - 0 Drill Intersections- Gold metre-grams >30 m-g 20-30 m-g 10-20 m-g 5-10 m-g 1-5m-g <1 m-g Planned Hole DISPLACED DUFFER LODE 0 Interpreted High Grade Shoot Interpreted High Grade Shoot Interpreted High-Grade Shoot Righ Interpreted High Grade Shoot 0 50m 100m ASX BMR 12
View entire presentation