Acquisition of Khoemacau
3 Brownfield expansion to ~130ktpa
Khoemacau expansion to leverage off existing infrastructure and proven mining and processing methods
Khoemacau ramp-up profile by deposit
Mine Output (Mtpa)
9.0
8.0
7.0
Roadmap to ~130ktpa copper production
•
Resource
•
Mango
•
Zeta NE
Mining
•
Zone 5 extensions & expansion deposits to deliver >130ktpa
Consistent geology and mineralogy across multiple deposits
Increase in Zone 5 production without significant expenditure
New UG mines replicate proven mining method at Zone 5
18
6.0
5.0
4.0
3.0
2.0
10
1.0
Zone 5 North
•
Processing
Zone 5
•
New 4.5Mtpa process plant, increasing capacity to ~8.2Mtpa
Similar metallurgical properties to current operations
Infrastructure
Internal power line sized to accommodate the expansion
Multiple water sources and mine dewatering available
Concentrate
Sales
2024
2025
2026
2027
2028
2029
2030
•
Clean concentrate with high payabilities and low impurities
Zone 5N and Zeta NE are outside the silver stream agreement
M