Panasqueira Tungsten-Tin Mine Presentation
PANASQUEIRA - MINING FACILITIES
Existing Infrastructure & Equipment will be used for the L4-Extension
Panasqueira mine has extensive mining, processing and environmental infrastructures
Plays an important role in the regional economy, as the local community depends
almost entirely on the mine for employment
Capacity of surface equipment is sufficient for the L4-Extension, therefore, only
underground equipment has to be built, e.g. crusher & shafts
Messe
2015/03/01
Waste Water treatment
facilities
Underground crushing
chamber
BARROCA GRANDE
nur mentora das Muse ca Faranqueath
A ALMONTY
fin
In-house completed & designed new fine tailings pond (on
the right) - Capacity for a further 27 years
LEGEND:
Mining Concession
-Vale Ermida
Vale Muro
Panasqueira
Level 0 (680m)
Level 1 (620m)
Level 2 (560m)
Drainage Level (530m)
Level 3 (470m)
0
500
1000 m
Extensive underground infrastructure
and surface installations
26View entire presentation