NHPC Capacity Addition and Financial Overview
Installed
Capacity
Under
Construction
Awaiting
Clearances
Power ܀
PHYSICAL SNAPSHOT
Stations under Operation-22 Nos.
(5551 MW*)
✰ Power Stations with Subsidiary (NHDC) - Nos.
(1520 MW)
Total Operational Projects - 24 Nos. (7071 MW)
✰ Projects Under Construction (including
Subsidiary & JV) :-
•
•
Hydro & Solar-16 Nos. (10515 MW)
✰ Projects Awaiting Clearances: -
Standalone - 4 Nos. (3116 MW)
Subsidiary-2 No. (996 MW)
5
Hydro Power is 11% (46850 MW) of
All India Installed Capacity (416059
MW**).
NHPC Contribution is 15% of Installed
Hydro Power On Consolidated Basis.
Status
Capacity (MW)
Operational Projects
7,071
Projects Under Construction
(including Subsidiary & JV)
10,515
Projects Under Clearance:
Stand alone
3,116
Subsidiaries
996
Projects Under Survey &
Investigation
890
22,588
Under Survey
& Investigation
✰ Projects under Survey & Investigation -
*
2 Nos. (890 MW)
Total
Including 50 MW Wind Power Project, Jaisalmer & 50
MW Solar Power Project, Tamilnadu.
** Source-CEA as on 31.03.2023