Nabarlek Project: Exploration and Upside Potential
S
The Nabarlek Deposit: Where it is all about the grade!!
9700mN
9750mN
N
Section
9725mN
Pre-mining surface
0.1/1
0.5/12.9
1.7/25
19/1.2
0.6/14.9
00.7/11
1.1/11
1.9/17
0.1/0.8
0.8/9.8
1.5/25
1.6/17.1
0.1/1.5
0.4/8.2
0.9/11
1.1/10.4
0.3/8
00.3/2
2.3/28.1
1.1/26
3.5/11
0.9/16.8
0.4/11.8
4.3/12
1.7/12
1.2/10.3
12.5/7.1
0.2/1.8
2.5/7.7
2.7/15.6
9.6/16
0.9/12.7
1.7/12
0.4/11,7
0.9/9.1 0.1/0.8
0.1/0.3
8.4/12.5
9.4/8.5
11.9/15
0.8/10.2
0.5/11.5
0.3/2.8
2.8/17.4
3.9/18.8
0.2/1
2.4/12
1.2/15.9
6.5/13.5
1.5/13.5
13.5/19.2
6.7/17.5
8.8/11
0.9/5.4
14/6.9 0.2/1
7.3/1.2
7.6/22.1
16.9/10.2-
11.4/12.5
0.5/7.6
1.11/15.9
8.4/13.3
0.6/8.4
2.6/1.8
0.2/1 0.6/3.4
0.2/0.7
0.1/2.3
Cahill Formation
0.7/1.5
0.4/0.4
Pit outline (mined)
40mRL
40mRL-
% U₂O, x metres
1-3
3-30
80mRL
Cahill Formation
NAD87
NAR140
10,100mE
NAR200
1.1%/11
NAD052
NAD209
0.6%/14.9
0.3%/8
Six Fault
2.7%/15.6
9.6%/16
13.5%/19.2
NAD028
NAD193
10,140mE
NAD120
0.0%/2
0.2%/0.7
NAD220
6.7%/17.5
1.1%/15.9
0.2%/0.7
•
North Fault
25m
Dolerite
> 30
% U₁₂O/metres
Nabarlek Pit (North)
Long Section
Legend
Downhole Intercepts
%U₂O₂/metres
Nabarlek Shear
North Fault
20m
Dolerite
Nabarlek Uranium Mineralisation: Significant concentration of Uranium Mineralisation mined from the pit
Strong Structural Control: Strong control to high-grade uranium mineralisation adjacent to the North Fault
•
Near-Mine Exploration: DevEx is targeting extensions to the Nabarlek Uranium Deposit
ASX: DEV Announcement - 9th October 2018. See slide 9 for location of cross section
NAD003
NAD053
Pit outline (mined)
Nabarlek Uranium Mine
Section 9725 mN
8
NAD145View entire presentation