Historical Operating Results and Sustainability Framework
Kışladağ: Recent Achievements
Ramping up upgraded materials handling and agglomeration equipment
Q3 2023 Highlights
Q3 gold production of 37,219 ozs at cash operating
costs (1) of $622/oz sold
Record(2) ore tonnes of 3.6 million placed on the pad
in Q3
Completed commissioning of the fine-ore
agglomeration circuit, performing as expected
Commenced stacking on North Heap Leach Pad in
mid-July, three cells under leach
Production expected to increase in Q4 2023:
•
•
Realization of full effectiveness of the upgraded
materials handling equipment.
Stacked ore leaching was delayed as a result of
the extraordinary rainfall in Q2
eldorado gold
Agglomeration Product
(1) These are non-IFRS financial measures or ratios. See Slide 2 'Non-IFRS Measures' for more information. (2) Record over the past 6.5 years
.
20
20View entire presentation