JSC Atomenergoprom Annual Report slide image

JSC Atomenergoprom Annual Report

PERFORMANCE OF DIVISIONS JSC ATOMENERGOPROM / ANNUAL REPORT / 70 Plans for 2023: - - - To increase revenue from new products and sales in foreign markets; To carry out existing contracts and develop cooperation with foreign companies and industrial partners; To consolidate the Division's positions in target markets; To expand the range of equipment supplied by the Division and its sales footprint. Nuclear power industry: - - To ensure the supply of key equipment and perform work under the new NPP construction programme; To assess the possibility for the Division to manufacture NPP equipment previously produced by enterprises outside the industry: multi-stud tensioners (MSTS) for main reactor joints and flange connectors of steam generators; inspection cavity equipment and embedded parts; main steam valve units; storage pool racks (for sealed fuel storage) and storage racks for fuel assemblies (for fresh fuel); To increase the volume of servicing contracts; To explore the possibility of supplying a wide range of equipment as part of the import substitution programme. Gas and petrochemical industry: - To produce and supply LNG pumps for the Arctic LNG 2 and Baltic GCC projects, produce and test pilot cryogenic LNG pumps for gas carriers; To implement the project to develop and manufacture LNG loading arms for the Baltic Gas Chemical Complex; To implement the project to develop and manufacture coil-wound heat exchangers for LNG production with mixed refrigerants for process lines supported by gravity-based structures (GBSs); To implement the project to develop and manufacture ethane evaporators for the Arctic Cascade 2 process. Thermal power industry: - To complete the supply of equipment for municipal waste incineration plants and prepare the first two plants for commissioning; To develop the project to build a municipal waste incineration plant; To participate in tenders for the supply of equipment as part of the programme to upgrade thermal power facilities and for new construction projects. Icebreaker fleet: - To sign contracts for the supply of equipment for follow-on nuclear icebreakers and auxiliary equipment (filters, heat exchangers, deck equipment), and large-sized castings; To complete the manufacture of castings of inboard struts (port and starboard) and ship them to the customer; carry out procurement procedures under the contract for the package supply of the nuclear propulsion unit. Modernised floating power units (MFPUs): The Division will continue the construction of MFPUs. The project to provide power supply for the Baimskaya Ore Zone has given impetus for the development of an entire family of FPUS differing in terms of their capacity and applications (designed for use in the Arctic and in tropical regions), provid- ing considerable opportunities for the implementation of large-scale industrial projects. 00 00 ======== 00 00 00 00 00 00 ° 00 00 000000 00 n00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 PERFORMANCE OF DIVISIONS JSC ATOMENERGOPROM / ANNUAL REPORT / 71
View entire presentation