Investor Presentaiton
Development Plans > Enhancement of Production Platform
Enhancement of Production Platform
Capex drives output growth and improvements in efficiency
Over USD 10 billion¹
Total Investment Capex 2007-15
2015 output
Upstream
Downstream
Midstream,
123
Crude steel
•
22 m t
Main Goals
•
Increase steel production
Quality improvements
Fast growth of HVA products
Efficiency gains
Change
> 100%
•
•
Major projects²
BF #7 (+3.4 m tpy) - Novolipetsk
EAF (+1.5 m tpy) - Novolipetsk
EAF (+3.6 m tpy) - Maxi-Group (to reach 6.0 m tpy)
•
6.9 m tpy of HRC
>30%
Finished steel
products
.
• 0.6 m tpy of HR thick plate
(Flat and long steel)
•
5.9 m tpy of longs and pipes³
>20%
3 x
•
•
3 CR mills (+0.57 m tpy) - Novolipetsk
Pre-painting line (+0.2 m tpy) - Novolipetsk
Galvanizing line No.4 (+0.3 m tpy) - Novolipetsk
Wire-rod (+1.0 m tpy) - Maxi-Group
Rebar and shaped profile (+2m tpy) - Maxi-Group
Pelletizing plant - Stoilensky GOK
Coal deposit development - Zhernovskoe 1
Pellets
Coking coal
Coke
•
6.0 m tpy
•
3 m tpy (by 2012)
•
6.5 m tpy
~30%
•
Battery #6 construction - Altai-koks
Scrap
Energy
Excluding raw materials assets capex;
~7.8 m tpy
>60% of requirements4
Go to slides #30-31 for more detailed information;
The numbers are preliminary and could be further changed; 4. Numbers for the main production site
~160%
~40%
•
Scrap collecting yards expansion - Maxi-Group
Additional electric generating capacities to be
installed - Novolipetsk
17View entire presentation