Khemisset Project Investment Highlights

ONGOING SITE WORKS TO SUPPORT BASIC ENGINEERING KHEMISSET PROJECT EMMERSONPLC MSLMINERALS. KHEMISSET PROJECT Deep Drilling (Decline Alignment) Campaign The drilling campaign of 200m (DA-1), 400m (DA-2), 1,200m (DA-4), 2,000m (DA-6) & 3,200m (DA-9) has now been completed. Therefore, the first stage of the Geotechnical Geological drilling campaign for decline alignment has been finished. Surface/Shallow Geological Investigations This program has finished. The campaign included 20 shallow drillholes with SPT (Standard Penetration Test) and detailed sampling for testing program: 17 CPT (Cone Penetration Test) and Electrical Resistivity Tomography survey for analysis of surface geology. Core Logging, Testing & Storing Local to the site, there is a well managed and maintained core store where each sample is taken for logging, testing and storing. This is an ongoing operation and the value added to the project at this facility is immeasurable. 18