Investor Presentaiton slide image

Investor Presentaiton

66 Dy Dysprosium 162.50 STALLION RARE EARTHS (REE) PROJECT PHASE 1 DRILLING Exceptional Drill Results 514,000 ME 515,000 mE 516,000 ME • Best intercepts from the Phase 1 Drilling include: - 6,659,000 mN • • • STRC014: 23m @ 2,162.45 ppm TREO from 24m STRC012: 15m @ 3,088.84 ppm TREO from 39m STRC011: 17m @ 3,783.4 ppm TREO from 61m inc. Im @ 1.52% TREO from 73m • Outlined a broad, relatively shallow mineralised zone that measures 2km x 2.5km, with a thickness averaging 18m and grade averaging ~1,750ppm TREO ⚫ Critical permanent magnet metals, neodymium (Nd) and praseodymium (Pr), or NdPr, averages 23.63% - substantially above the industry average of -16% ⚫ The mineralised zone is open in all directions, and only the lack of drilling limits its scale E 28/3241 Map Area E 28/2999 STRC001:48m 9m at 555ppm TREO -6,658,000 MN STRC012: 54m 15m at 3,089ppm TREO STRC013: 48m 15m at 736ppm TREO STRC014: 52m 28m at 2,162ppm TREO (Incl. 13m at 3,477ppm TREO) -6,657,000 mN 514,000 mE I STRC002: 60m 2m at 1,096ppm TREO STRC011:78m 17m at 3,783ppm TREO STRC004: 48m 22m at 953ppm TREO (Incl. 18m at 1,088ppm TREO) 515,000 ME SUMMIT SMMINERALS LTD 517,000 ME E 28/3241 518,000 ME E 28/2999 STRC010:18m STRC009: 34m STRC008:27m STRC007:46m See Schematic Cross Section 10,400mN STRC005: 60m 3m at 1,030ppm TREO STRC006:108m 17m at 1,090ppm TREO Porth 6,659,000 mN- Project Location 6,658,000 mN- 6,657,000 mN- STRC003: 60m 28m at 881ppm TREO (Incl. 8m at 1,030ppm TREO) SM SUMMIT MINERALS LEGEND Stallion REE PROJECT 500 metre Summit Tenement Phase 1 Drill Holes ● Phase 2 Drill Holes ● Historic Drillholes 516,000 ME 517,000 ME I I 518,000 ME 13
View entire presentation