Investor Presentaiton
66
Dy
Dysprosium
162.50
STALLION RARE EARTHS (REE) PROJECT
PHASE 1 DRILLING
Exceptional Drill Results
514,000 ME
515,000 mE
516,000 ME
•
Best intercepts from the Phase 1 Drilling include:
- 6,659,000 mN
•
•
•
STRC014: 23m @ 2,162.45 ppm TREO from 24m
STRC012: 15m @ 3,088.84 ppm TREO from 39m
STRC011: 17m @ 3,783.4 ppm TREO from
61m inc. Im @ 1.52% TREO from 73m
• Outlined a broad, relatively shallow mineralised
zone that measures 2km x 2.5km, with a
thickness averaging 18m and grade averaging
~1,750ppm TREO
⚫ Critical permanent magnet metals, neodymium
(Nd) and praseodymium (Pr), or NdPr, averages
23.63% - substantially above the industry
average of -16%
⚫ The mineralised zone is open in all directions,
and only the lack of drilling limits its scale
E 28/3241
Map
Area
E 28/2999
STRC001:48m
9m at 555ppm TREO
-6,658,000 MN
STRC012: 54m
15m at 3,089ppm TREO
STRC013: 48m
15m at 736ppm TREO
STRC014: 52m
28m at 2,162ppm TREO
(Incl. 13m at 3,477ppm TREO)
-6,657,000 mN
514,000 mE
I
STRC002: 60m
2m at 1,096ppm TREO
STRC011:78m
17m at 3,783ppm TREO
STRC004: 48m
22m at 953ppm TREO
(Incl. 18m at 1,088ppm TREO)
515,000 ME
SUMMIT
SMMINERALS
LTD
517,000 ME
E 28/3241
518,000 ME
E 28/2999
STRC010:18m
STRC009: 34m
STRC008:27m
STRC007:46m
See Schematic
Cross Section
10,400mN
STRC005: 60m
3m at 1,030ppm TREO
STRC006:108m
17m at 1,090ppm TREO
Porth
6,659,000 mN-
Project
Location
6,658,000 mN-
6,657,000 mN-
STRC003: 60m
28m at 881ppm TREO
(Incl. 8m at 1,030ppm TREO)
SM
SUMMIT
MINERALS
LEGEND
Stallion REE PROJECT
500
metre
Summit Tenement
Phase 1 Drill Holes
● Phase 2 Drill Holes
● Historic Drillholes
516,000 ME
517,000 ME
I
I
518,000 ME
13View entire presentation