Investor Presentaiton
Creating Value
Case study: Substantial electricity transmission required to facilitate the accelerating
renewable energy buildout across Australia
$54bn¹
of new transmission
investment required
across Australia²
Includes 35 REZS identified
across eastern Australia3
Customer Drivers
Why APA expects to be the partner of choice in electricity
transmission
125GW
Additional VRE
capacity by 20504
*
Significant electricity
transmission development
required to connect
Renewable Energy Zones to
end-users
Sub-sea electricity
transmission cables required
to connect off-shore wind
farms and support
Australia's renewable
generation ambition
Electrification of mining
operations and development
of new industries such as
hydrogen and green
ammonia production will
require new electricity
transmission connections
•
Trusted owner and operator of complex energy infrastructure
An established Electricity Transmission team with deep operational and project delivery
expertise
Extensive experience working and engaging with communities in the development and
delivery of linear energy infrastructure
Operations synergies and relationships with energy market operators
Case study
Basslink
•
370 km subsea electricity interconnector connecting
Tasmania to the mainland
•
Integration of Basslink well underway, nearing completion
.
Consolidation of Basslink's Operations and Maintenance
within APA's existing operations
•
• 99.95% customer availability since ownership
1. Estimated addressable market size in Australia. Estimate is based on a number of key assumptions, including in relation to macroeconomic factors, future technology advancements and costs, market demand, regulatory requirements and government policies and there can be no
assurance the estimate is accurate. The actual addressable market size may differ materially from the estimate because events frequently do not occur as projected.
2. Includes sub-sea electricity transmission cables. 3. AEMO 2022 ISP Appendix 3. 4. VRE = Variable Renewable Capacity; AEMO 2022 ISP Step Change Scenario.
apa
APA FY23 Results Investor Presentation
22View entire presentation