Investor Presentaiton
For personal use only
9
Coal Production
Attributable Saleable Production by Asset *
(Million tonnes)
■ HVO
■Stratford Duralie Watagan
■Moolarben
■MTW
■ Yarrabee
> Non-attributable
60
60
50
40
40
30
52.1
51.8
50.0
38.3
35.6
32.9
31.5
19.8
20
20
18.5
12.0
10
Delivered on 2020 guidance of ~38Mt of
attributable saleable coal production.
The 8% increase in attributable saleable coal
includes the benefit of the additional 10% stake
in Moolarben.
Large-scale, low-cost and long-life mines
underpin performance :
Moolarben,
Mount Thorley Warkworth (MTW),
0
2016
2017
2018
2019
2020
Hunter Valley Operations (HVO).
Large-scale, low-cost mines represent about 90% of attributable production
*Attributable figures include: Mount Thorley Warkworth (82.9%); Hunter Valley Operations (51%); Stratford Duralie (100%), Yarrabee (100%) and Moolarben (81% - up
to and including 30 November 2018, then 85% up to and including 31 December 2019, then 95% thereafter). Note the economic benefit from Moolarben increased
from 85% to 95% from 1 April 2020 onwards, with the 3 month difference captured in the transaction terms. Watagan contribution changes from equity accounted to
attributable from 17 December 2020 onwards.
YANCOAL
充煤澳大利亚有限公司View entire presentation