Nikola SPAC Presentation Deck
DEDICATED FCEV FLEET
ROLL OUT CASE STUDY
ANHEUSER-BUSCH (AB)
AB PILOT STATION
• Currently working with Nel to build 8-ton hydrogen station near the
Anheuser-Busch brewery in Van Nuys, CA
Station capable of producing 8,000 kgs of hydrogen per day
• Station expected to be fully commissioned in 2022
.
.
Fleet Test Beta Trucks with AB Starting mid-2021 utilizing Phoenix
hydrogen station until Van Nuys station complete in 2022
Initial site selection determined based on
customers' dedicated routes
• Nikola's first two stations are planned to support approx. 400 miles
interstate along 1-10 between AB's Van Nuys, CA brewery and a third-
party distribution partner located in Chandler, AZ
☆☆
* Brewery Locations
* Distribution Centers
* Third-Party Distribution Partner
NIKOLA
Van Nuys, CA
ANHEUSER-BUSCH STATION LOCATIONS
• AB to convert entire distribution fleet (approx.
800 trucks) to Nikola trucks
.
• AB has 12 breweries and 6 distribution centers
located across the United States
• Nikola anticipates developing a hydrogen
station near each brewery location to provide
access to each distribution center
• Additional stations may be developed at certain
distribution centers depending on the roundtrip
length of the lane
27View entire presentation