Investor Presentaiton slide image

Investor Presentaiton

MOTA-ENGIL Backlog of €5.2 bn in June 2019 Total backlog evolution (€ mn) E&C backlog by segment Total Backlog E&C Backlog E&C Turnover 5,138 5,465 5,199 Oil&Gas and Power 4,422 6% 4,777 4,516 4,305 3,779 Civil Construction 18% 1,768 2016 2,046 2017 2,298 2,3321 2018 Jun. 19 Mining 13% Roads, infrastructures and others 63% Backlog by region Latin America 24% Africa 51% Europe 25% The E&C activity represents 87% of the total backlog with a backlog to sales² ratio of 1.9x Africa continues to account for the majority of the backlog reaching €2,648 mn Good commercial perspectives for 2019, namely in the main markets such as Portugal, Mozambique, Brazil New Contracts awarded after June: Brazil (Waste: €144 mn and € 122mn / both 5 years, and Oil&Gas: €25 mn), Mexico (€165 mn Fairmont), Panama (Metro: €159 mn – ME: 49%) and New Caledonia (Strategy "Follow the Client" / Vale) ¹E&C turnover of the last twelve months; 2Ratio calculated as follows: E&C Backlog/E&C Turnover. 10
View entire presentation