Funding PNG's Electrification: Vanimo Case Study
However we have explored a range of generation solutions for
Vanimo including use of timber off-cuts for biomass
Relative comparison of generation options
SS
+$
$
X =
Biomass
Solar Batteries
INDICATIVE
Hydroelectricity Dam
Mid-high construction costs
Mid-high construction costs
Moderate construction costs
High maintenance costs
Moderate maintenance costs
Low maintenance costs
High maintenance
Low maintenance
Low maintenance
Many local ongoing jobs
Few local ongoing jobs
Few local ongoing jobs
Operates at 90% capacity
Operates at 20% capacity
Operates at 65% capacity
Short construction time
Moderate construction time
Mid-Long construction time
Source: Powering PNG into the Asian Century, ANZ Insight, 2015; Renewable Energy Opportunities and Challenges in the Pacific Islands Region - PNG, IRENA, 2013