Investor Presentaiton
Pit cooling - Key activities and achievements
Pre-Feasibility Study ongoing
•
•
•
Cooling the Hot Ground with cold water injection (CWI):
•
Drilling of 6 long directional wells completed
Water treatment plant completed and 7 months of CWI successfully trialled and demonstrating cooling.
Enhancing Depressurisation capability:
•
•
Prototyping of longer horizontal steam relief wells successful
Three sub-vertical steam relief wells completed and venting steam for pressure release
Forward Work:
•
Complete CWI trials, analysis and PFS reporting through FY20
•
Complete studies on additional methods for mitigating hot ground risks
Directional drilling and cold water injection pad
Slant
CWI
H2D #3
Slant Wells
w/CWI
HZD #4
KSP SRW
Kapit
Triplet
Flankers
KSP SRM
BR 1909
Steam Relieve
Wells
Strategic CWI
SRW1910
CW115-00
Horizontal CWIMme..00
HDMO
HZD #1
SRM1903
C1902
SRM1901
HZD #2
M1911
Diagram of directional drilling