Investor Presentaiton slide image

Investor Presentaiton

3 Established and Integrated Owned Infrastructure Allows for Low Cost, Organic Capacity Expansion Tabang infrastructure is complete, with discretionary low capex brownfield growth available if the environment is supportive Capacity (Mtpa) 60+ Direct BCT: 368km 69 km Haul road Tabang Mine Senyiur Jetty Barging 94 km Barging BCT: 274 km KFT-1/2: 256 km BCT Transshipment KFT-1 30+ KFT-2 102 km Haul road (1) Barging 181 km Barging BCT: 288 km Haul road(2) 24 km Transshipment Gunung Sari Jetty Mahakam River Port Facilities at Muara Pahu Barging Today Upside Established mine to port infrastructure owned by Bayan. Haul trucks and barges owned / operated by trusted third party contractors Notes 20-25 km Haul road Teguh mine Teguh (TSA) Jetty Barging 463 km Wahana mine 21-30 km Haul road Barging 20 km Wahana (WBM) Jetty 15-20 km Haul road Perkasa mine Perkasa (PIK) Jetty Direct shiploading to Handy / Panamax Vessels Capacity (Mtpa) 40+ 24 BCT Today Upside 8-10 Floating crane Today 8-10 (1) Bayan is in the process of permitting and designing a haul road from the Tabang mine direct to the Mahakam River, which would allow Bayan to minimize its reliance on the seasonal rivers served by the Senyiur and Gunung Sari Jetties, to barge our coal from the Tabang mine to BCT or floating transfer barges. Road construction is expected to complete in 2022. (2) Public haul road to Gunung Sari Jetty. 24 Today PT BAYAN RESOURCES Tbk.
View entire presentation