Hindustan Zinc Strategic Priorities and Growth Overview
HINDUSTAN ZINC
Zinc & Sver of India
Sharp Focus on Strategic Priorities driving Long-Term Growth
EXPANSION OF CAPACITIES
Underground (UG) Production (MIC production, kt)
WEL-COME
RAMPURA AGUCHA U/G MINE
יבוווווווםוב
•
Vision to be world's largest lead-zinc-silver company
Increase ore production to 25 Mtpa and Silver to 1,000
tons (top 3)
2013-14
2016-17
2019-20
Invest in operational methods and tools to accelerate
the mine development rate, improve productivity and
optimize cost
2020-21
Targeted
MAINTAINING A PORTFOLIO OF MINES WITH
LONG LIFE
•
Grow R&R through exploration
.
Increase ore production to 2 Mtpa with combined
Paste-fill and Dry Tailing Plant at Rajpura Dariba
Zawar mine expansion to 4.8 Mtpa along with Backfill
जीवन
plants at ZawarMala and Mochia mines to improve
mining ore recovery
•
improve productivity and optimize cost
210
481
917
972
1,200
Ramping up R&R (total R&R Mt)
2003-04
146
2010-11
313
2019-20
403
2020-21
448
Targeted
550
STRENGTHEN COST LEADERSHIP
•
Lowest cost producers of zinc-lead globally led by
transition to UG mining
Continually ramp volume and deploy automation
technologies to increase ore-to-metal index, boost
asset productivity, optimize power and generate value
from waste
Keeping Costs Under Check
(zinc cost curve, ranked by C1, composite cost)
Cost ($/t Paid Zn)
3200
C1
2400
1600
800
°
0
1000 2000 3000
4000
5000
6000
7000
8000