Investor Presentaiton
Dam
Project
Client
Naruse Dam construction work (1st term)
: Ministry of Land, Infrastructure,
Transport, and Tourism Tohoku
Regional Development Bureau
Place of construction: Higashinaruse-village,Akita
Prefecture
Construction Outline: Trapezoid CSG Dam
(H) 114.5m, crest
length=755.0m, dam
volume=48,500,000m
Construction period : May 2018 ~ Dec 2022
Sewage (Shield)
Project
Ishinomaki City, Ishinomaki Central Trunk
Line Pipe Culvert Construction work Part 4
35
Client
: Japan Sewage Works Agency
Place of construction: Ishinomaki City, Miyagi Prefecture
Construction Outline : Reverse Circulation Type Shield Tunnel
Tunnel Extension (L)= 1,928m
Machine Inside Diameter
3,250mm etc
(D)
Construction period : Apr 2018
~
Mar 2022
Ishinomaki City, Ishinomaki Central Trunk
Line Pipe Culvert Construction work Part 4
⚫Tunnel Extension (L) = 1,928m
• Machine Inside Diameter (Q) =3,250mm
[仮事務所]
JR石巻線
山下中
|事務所|
陸前山下駅
JR仙石線
石巻駅
No.21 発進立坑
·石卷税務署
(その4工事)
◎石巻市役所
⊗石卷警察署
A
地中接合部
石巻立町郵便局
文化会館
Ishinomaki City, Ishinomaki Central Trunk
Line Pipe Culvert Construction work Part 2
⚫ Tunnel Extension (L) = 1,225m
• Machine Inside Diameter () =4,250mm
の2工
アイトピア
240
地山探查装置
カッタービット
コピーカッター
搅拌翼(4個)
コピーカッター
摩耗検知ピット
(検知高さ35mm)
520 ()
マンホール
先行ビット/
メインビット
|最外周保護ビット
(最外周ローラーカッター切削外径
3810 (カッター
旧北上川
カッター駆動用油圧モーター 中折れシール (中折れ角度 3.5° )
エレクター昇降ジャッキ
後方作業台
送泥(BB)
ロータリー
中折れジャ
「ジョイント
バイパス管 (88)
(2B×10ヶ所)
排泥管(10B)予肯送泥情(12/
エレクター摺動ジャッキ
3708(テール内径)
●3780 (シールド外径)
固定そり前胴注入口」
シールドジャッキ
注入口
テールシール
(2B×8ヶ所)
(ワイヤーブラシ2段)View entire presentation