Dam Project Client Naruse Dam construction work (1st term) : Ministry of Land, Infrastructure, Transport, and Tourism Tohoku Regional Development Bureau Place of construction: Higashinaruse-village,Akita Prefecture Construction Outline: Trapezoid CSG Dam (H) 114.5m, crest length=755.0m, dam volume=48,500,000m Construction period : May 2018 ~ Dec 2022 Sewage (Shield) Project Ishinomaki City, Ishinomaki Central Trunk Line Pipe Culvert Construction work Part 4 35 Client : Japan Sewage Works Agency Place of construction: Ishinomaki City, Miyagi Prefecture Construction Outline : Reverse Circulation Type Shield Tunnel Tunnel Extension (L)= 1,928m Machine Inside Diameter 3,250mm etc (D) Construction period : Apr 2018 ~ Mar 2022 Ishinomaki City, Ishinomaki Central Trunk Line Pipe Culvert Construction work Part 4 ⚫Tunnel Extension (L) = 1,928m • Machine Inside Diameter (Q) =3,250mm [仮事務所] JR石巻線 山下中 |事務所| 陸前山下駅 JR仙石線 石巻駅 No.21 発進立坑 ·石卷税務署 (その4工事) ◎石巻市役所 ⊗石卷警察署 A 地中接合部 石巻立町郵便局 文化会館 Ishinomaki City, Ishinomaki Central Trunk Line Pipe Culvert Construction work Part 2 ⚫ Tunnel Extension (L) = 1,225m • Machine Inside Diameter () =4,250mm の2工 アイトピア 240 地山探查装置 カッタービット コピーカッター 搅拌翼(4個) コピーカッター 摩耗検知ピット (検知高さ35mm) 520 () マンホール 先行ビット/ メインビット |最外周保護ビット (最外周ローラーカッター切削外径 3810 (カッター 旧北上川 カッター駆動用油圧モーター 中折れシール (中折れ角度 3.5° ) エレクター昇降ジャッキ 後方作業台 送泥(BB) ロータリー 中折れジャ 「ジョイント バイパス管 (88) (2B×10ヶ所) 排泥管(10B)予肯送泥情(12/ エレクター摺動ジャッキ 3708(テール内径) ●3780 (シールド外径) 固定そり前胴注入口」 シールドジャッキ 注入口 テールシール (2B×8ヶ所) (ワイヤーブラシ2段)
View entire presentation