Washihi Copper-Gold Project Exploration Update
Mineralisation - Zone 2
Mineralisation in Zone 2 is flat lying and shallow, deepening to the east
900
Elev.
Easting
-200
Section 11
-150
Ground level
Pit Limit
-100
-50
$2.83
KZ2_315
KZ2_314
KZ2_313
KZ2_312
Z2_311
KNP 24
50
Alara
100
ALARA RESOURCES
LIMITED
Khnaiguiyah
Zinc-Copper Project
KZ2 351
Ground level
Pit Limit
Alaa
resources
S11 Drill hole intersections:
KZ2 311: 8m @ 4.6% Zn, 0.5% Cu
KZ2 351: 8m @ 7.5% Zn, 0.3% Cu
18m @ 7.2% Zn, 0.1% Cu
KZ2_312:
KZ2 313: 17m @ 18% Zn, 0.3% Cu
KZ2 314: 18m @ 6.5% Zn, 0.25% Cu
KZ2 315: 24m @ 5.5.% Zn, 0.2% Cu
750
Mineralised Zone 2
Section Profile 11
Host rock
Mineralisation
Mineralisation intercept
Hole
Pit limit
37.5
75
150 Metres
Copper grade
Zinc grade
O Alara Resources Limited
47.92
45.0
009
$9.50
Scale: 1:1,500
Mineralised zone
Hanging wall / footwall
www.alararesources.com
Section 11
e
+
17View entire presentation