Investor Presentaiton
-
Golden Ridge – Diamond drilling in progress at Trafalgar prospect
Trafalgar: qtz-Aspy fractures in altered
granodiorite outcrop (10.9 g/t Au)
Trafalgar: VG in metaseds from old
1 cm
Historical drillhole TFD001
successfully targeted bonanza
grade gold beneath old
workings but failed to
intersect the granite-hornfels
contact.
Significant results¹ include;
5.0m @ 12.26g/t Au from
202.0m
6.0m @ 1.7 g/t Au from
217.0m
Current program includes;
●
1,400m drilling planned in
3-4 holes
Testing extensions to the
system and the granite-
sediment contact
Hole TFDD002 in progress
(EDGI co-funded)
workings (61 g/t Au)
◉Flynn Gold
1FG1: ASX 15 June 2021 (Prospectus)
5,416,400 mN
5,416,600 mN
5,416,800 r
588,000 ME
Planned
588,200 mE
588,400 mE
Area of surficial workings:
up to 61.0g/t Au from rock
chip sampling.
TFD001
Planned
TFDD002*
TFD001:
5.0m @ 12.56g/t Au
Outcropping mineralised
granodiorite: up to 10.9g/t
Au from rock chip sampling.
100
meters
588,000 mE
588,200 ME
588,400 mE
GEOLOGY
Golden Ridge Granodiorite
Mathinna Group Sediments - Hornfelsed
ROCKS Au g/t
Drill Hole Au g/t
> 5.0 g/t Au
1.0 to 5.0 g/t Au
> 5.0 g/t Au
1.0 to 5.0 g/t Au
0.3 to 1.0 g/t Au
0.3 to 1.0 g/t Au
0.1 to 0.3 g/t Au
0.1 to 0.3 g/t Au
< 0.1 g/t Au
5,416,600 mN
5,416,400 mN
FG1 drill holes planned
Historical drill holes
Stream
◉Flynn Gold
Trafalgar Prospect
Drill Hole Plan
10View entire presentation