ADB-PLN Electrical Grid Strengthening Program

Need for Transmission Investment in Indonesia. 1 RUPTL 2019, identified additional transmission lines of 57,000 km, and sub-station transformer capacity of 124,000 MVA by 2028. Need to carefully assess what is really needed to avoid costly overbuilt. 2 ADB New transmission grid investments needed in Sumatra, Kalimantan, Java for intra-regional connection and reliability. EHV (km) Vietnam -500kV+220kV Indonesia - 500kV+275kV (EVN annual reports) (PLN statistics) 3 Inter-regional grid strengthening needed for example in Java/Bali to accommodate new generation. 2014 19,285 6,427 2018 24,876 8,531 Change (2014-18) 5,609 2,104 5 Introduction of "smart grid" technologies will require new investment in substations, control centers, etc.. 4 Date 23rd Feb 2021 Integration of renewable energy presents challenges: Geographical dispersion Small, multiple projects Need to smooth out variability in large geographical areas 7