Investor Presentaiton
Possible PNG LNG access
.
Exxon and
Oilsearch are
currently drilling
P'nyang South
appraisal well in
PRL 03
Large enough to
justify a pipeline to
the PNG LNG
project for the third
LNG train
Very straightforward
to build a short
connecting line from
PRL 28 and PPL
259.
WEST PAPUA
Tedi
Sawmill Flats
Ningerum
Proposed location
of condensate
production facility
Stanley-1
Stanley-2
Stanley 4
Hawenai
Siphon-1
STANLEY
Tope
Bridge
PRL3
Pnyang 2 p'nyang 1
Priyang 2/ST3
P'nyang 2/ST1
P'NYANG
Phyang 2/ST2
PPL
259b PRL4
Proposed
Kiunga-1X
pipeline route
Elewala |
Kiunga,
Proposed location of
condensate storage facility
Drimdenasuk
Proposed location of
condensate load out facility
Fly River
40km
River
PRL21
EAGLEWOOD ENERGY INC.
Possible P'Nyang to Juha
Gas Condensate pipeline
PPL269
PAPUA
NEW GUINEA
Ketu-1
Tingu
KETU
Ke-2
Proposed)
Ubuntu-1
Elevala
PRL28
UBUNTU
Flevala-1
ELEVALA
50km
Wewak
MAP AREA
oll pipelvis
PAPUA NEW GUINEA
Madang
Daru
Port
Moresby
500km
JUHA PRL2
Juha 3
Baia
PPL239
Juha 2
Juha 1
Honinabi
PPL239
Nomad
Proposed road upgrade
PPL259a
Debepare
PPL268
LEGEND
Gas/Condensate Field
Prospect
Lead
Petroleum Retention Licence
Licence Boundary
Oil and Gas Discovery
Oil and Gas Shows
Roads/tracks
Township
+ Airfields
20km
Strickland River
+
Waro
22
222View entire presentation