Investor Presentaiton
FY2021.3 initiatives
Structural Reform
(Drastic Strengthening of Management Structure) (4)
Productivity Improvement (1)
eki-net handling percentage
FY2021.3: 28.2%
JR
JR-EAST
Medium- and long-
FY2022.3 initiatives
term targets
Improve the replacement functions
of the eki-net system
FY2026.3
60%
Establish
an efficient
sales
system
Improve the in-house
Shinkansen ticketless
Significantly expand the area of
percentage
FY2021.3: 33.2%
Shift to mobile
Mobile Suica issuance
FY2021.3: 14.1 million subscribers
Touch de Go! Shinkansen
Discontinue handling of certain special tickets
(Shinkansen multiple-ride tickets, Shinkansen W
tickets, etc.)
FY2026.3
70%
Mobile Suica
app renewal
FY2026.3
Increase issuance and promote use
25.0 million
subscribers
Streamline
operation
systems
Smart
maintena
nce
Advance driver-only services
FY2021.3: 41 lines segments
Autonomous driving
Expand to Uchibo Line, Sotobo
Line, Kashima Line, Oga Line,
and Mito Line
Introduce automatic train operation (ATO)
devices to the Joban Line (local services)
Development of railcars and aboveground
equipment aimed at further advancement
â– Conduct verification tests for the autonomous
driving of not-in-service Series E7 Shinkansen
Promote monitoring of track facilities (operating trains)
Equipment
Promote
CBM
Electricity
Advance monitoring of overhead
contact lines (inspection trains)
Railcars
Improve efficiency of construction
through mechanization, etc.
Smart project
management
Digital technologies
Introduce to approx. 5,800 km
in regional areas
Use Yamanote and Yokosuka line railcars for monitoring
Improve work efficiency by using the Shinkansen Rail Exchange System (REXS)
Advance construction by using JRE-BIM (BIM and point cloud data, etc.)
Extend to more line
segments in stages
Introduce ATO to more
FY2023.3
line segments
Introduce to 6,540 km, mainly the Tokyo
metropolitan area and regional trunk lines
From FY2022.3 onward
Improve inspection accuracy
FY2025.3 Yamanote and Yokosuka lines
1,295 railcars (approx. 13.0% of the
Tokyo metropolitan area)
FY2027.3
Introduce to approx. 360 km of the
Tohoku Shinkansen
Introduce to all
construction projects
18View entire presentation