SPS Investor Fact Book October 2023 | Xcel Energy
SPS | Plant Information
Station, Location and Unit
Steam:
Fuel
Installed
Summer 2022
Net Dependable
Capability (MW)
Emissions Control
Equipment
Cunningham-Hobbs, NM, 2 Units
Natural Gas
Harrington-Amarillo (a), TX, 3 Units
Coal
1957-1965
1976-1980
225
1,018
Unit 1
Unit 2
ESP (PM), LNBs (NOx), ACI
(mercury), OFA
BH (PM), LNBs (NOx), ACI
(mercury), OFA
BH (PM), LNBs (NOx), ACI
(mercury), OFA
Unit 3
Jones-Lubbock, TX, 2 Units
Natural Gas
1971-1974
486
Each unit: OFA (NOx)
Maddox-Hobbs, NM, 1 Unit
Natural Gas
1967
112
OFA (NOx)
Nichols-Amarillo, TX, 3 Units
Natural Gas
1960-1968
457
Each unit: OFA (NOx)
Plant X-Earth, TX, 4 Units
Natural Gas
1952-1964
298
Unit 4: OFA (NOx)
Each unit: BH (PM), LNBS
Tolk-Muleshoe, TX, 2 Units
Coal
1982-1985
1,067
(NOx), ACI (mercury)
Combustion Turbine:
Cunningham-Hobbs, NM, 2 Units
Natural Gas
1998
207
Each unit: LNBs (NOx)
Jones-Lubbock, TX, 2 Units
Natural Gas
2011-2013
334
Each unit: LNBs (NOx)
Maddox-Hobbs, NM, 1 Unit
Natural Gas
1963-1976
61
Wind:
Hale-Plainview, TX, 239 Units
Sagamore-Dora, NM, 240 Units
Wind
Wind
2019
477 (b)
2020
507 (b)
Total
5,249
(a) Expected to be converted to natural gas by the end of 2024.
(b) Values disclosed are the generation levels at the point-of-interconnection for these wind units.
Capacity is attainable only when wind conditions are sufficiently available (on demand net dependable capacity is zero).
PM Particulate Matter
SCR Selective Catalytic Reduction
NOX - Nitrogen Oxides
ACI Activated Carbon Injection
LNBs Low-NOx Burners
OFA - Overfire Air
CO Carbon Monoxide
ESP Electrostatic Precipitator
BH - Baghouse
DLI- Dry Limestone Injection
LI-Lime Injection
UI-Urea Injection
DS-Dry Scrubber
WS- Wet Scrubber
WI Water Injection
MCM - Mechanical Collector & Multiclone
OC-Oxidation CatalystView entire presentation