Investor Presentaiton slide image

Investor Presentaiton

Drill Ready Epeius-Kaburi Project - Targets adjacent to significant drill intercepts TAJIRI RESOURCES Troy RC Drilling 5 & 400m from Boundary [email protected]/t & 1m@ 1.2g/t TSX-V: TAJ Troy RC drilling 600m from boundary 11m @ 5.1 g/t, 7m @ 3.2g/t, 7,500 m 2,000 m 20m @ 3.7g/t Ohio Creek Selected drill intersections 5m @ 16.5g/t fm 44m 5m @ 13.9g/t fm 34m 9m @ 40.5g/t fm 89m 16m @ 10.1g/t fm 2m 7m @ 22.9g/tfm 90m 4m @ 59.7g/tfm 70m The Epeius-Kaburi Project (blues) presents the following targets for immediate drill testing: • . • . 45m along strike from 16m @ 1.0g/t from 31m & 1m @ 9.0g/t from 87m, with 2 km of potential strike continuation of the Mine Unit. 200m away from the Babylon's Pit, the second largest artisanal bedrock working in the district with 1.8 km potential strike. 10m away from 6m @ 4.1g/t & 3m @ 11.2g/t-2000m potential strike 600m along strike from [email protected]/t from 71m, 7,500m of strike potential Drilling immediately on strike and at depth from Tajiri's 2013 drill intercepts of 22m @ 2.7g/t and 8m @ 6.5g/t. • Total strike of prospective structures >35 km. Good potential to define satellite deposits within trucking distance of Troy's mill and therefore even modest resources may be monetised. Troy RC Drilling 40m From boundary [email protected]/t & [email protected]/t Troy Drillholes 2,000 m 1,800 m 0 1,000 2,000 Metres Tajiri Drillholes (2013) 22m 2.7g/t, [email protected]/t, [email protected]/t & [email protected]/t 3,000 m Troy RC Drilling 10m from boundary [email protected]/t & [email protected] g/t Whitehorse Pit Babylon's Pit 200m from boundary
View entire presentation