ENHANCE EXISTING BUSINESS FOR SUSTAINABILITY
Power plants under construction
YEARS
33 EGCO
GROUP
Yunlin Holding GmbH
Project Progress: December 2022
73.14%
Type
Location
COD
Installed Capacity
PPA Term
Substation / Grid Connection:
80 Siemens Gamesa 8.0-167DD Wind Turbine Generators
Nameplate capacity: 8 MW plus power boost
Hub height: 110 meters
Rotor diameter: 167 meters
Yunlin, Taiwan
Q4/2021 2024 (Entire COD Q4/2024)
640 MW: January 2023, already COD 16 Turbines or 128 MW
20 years with Taiwan Power Company
Two onshore substations 66kV / 161kV 5km of HV cable to Taipower
Substation
Shareholders:
COD Timeline
Total Energies
Renewables S.A.S.
23%
EGCO
25%
2021
2022
2023
2024
Total
Turbines
4
10
22
44
80
Taiwan Offshore
Holding GmbH
25%
Starwind
Offshore GmbH
27%
MWs
32
80
176
352
640