1 ENHANCE EXISTING BUSINESS FOR SUSTAINABILITY Power plants under construction YEARS 33 EGCO GROUP Yunlin Holding GmbH Project Progress: December 2022 73.14% Type Location COD Installed Capacity PPA Term Substation / Grid Connection: 80 Siemens Gamesa 8.0-167DD Wind Turbine Generators Nameplate capacity: 8 MW plus power boost Hub height: 110 meters Rotor diameter: 167 meters Yunlin, Taiwan Q4/2021 2024 (Entire COD Q4/2024) 640 MW: January 2023, already COD 16 Turbines or 128 MW 20 years with Taiwan Power Company Two onshore substations 66kV / 161kV 5km of HV cable to Taipower Substation Shareholders: COD Timeline Total Energies Renewables S.A.S. 23% EGCO 25% 2021 2022 2023 2024 Total Turbines 4 10 22 44 80 Taiwan Offshore Holding GmbH 25% Starwind Offshore GmbH 27% MWs 32 80 176 352 640 16