Fresnillo Results Presentation Deck slide image

Fresnillo Results Presentation Deck

2021 PRELIMINARY RESULTS - OPERATIONS CIÉNEGA 2021 SUMMARY • Labour reform impacted development rates, equipment availability, tonnage and grade in 2H21 Lower volume of ore processed impacted by an electrical outage during the year Construction of stage one of the third tailings dam was concluded *As of 31 May 2021 2022 PRIORITIES • Maintain strict safety protocols Mitigate the impact of the labour reform • Advance exploration programmes to generate resources ● KEY OPERATING HIGHLIGHTS Silver production - moz Gold production - koz Cash cost - US$/oz of Au AISC - US$/oz of Au Reserves 2021 * Resources 2021 * Gold grade in reserve Silver grade in reserve 2021 5.4 48.8 (523.1) 656.1 41 2020 5.8 64.1 (276.2) 618.3 34.6 moz Ag, 330.8 koz Au 142.1 moz Ag, 1,647 koz Au 1.03 g/t 2.36 g/t 199 g/t 232 g/t