Fresnillo Results Presentation Deck
2021 PRELIMINARY RESULTS - OPERATIONS
CIÉNEGA
2021 SUMMARY
• Labour reform impacted development
rates, equipment availability, tonnage
and grade in 2H21
Lower volume of ore processed impacted
by an electrical outage during the year
Construction of stage one of the third
tailings dam was concluded
*As of 31 May 2021
2022 PRIORITIES
• Maintain strict safety protocols
Mitigate the impact of the labour reform
• Advance exploration programmes to
generate resources
●
KEY OPERATING HIGHLIGHTS
Silver production - moz
Gold production - koz
Cash cost - US$/oz of Au
AISC - US$/oz of Au
Reserves 2021 *
Resources 2021 *
Gold grade in reserve
Silver grade in reserve
2021
5.4
48.8
(523.1)
656.1
41
2020
5.8
64.1
(276.2)
618.3
34.6 moz Ag, 330.8 koz Au
142.1 moz Ag, 1,647 koz Au
1.03 g/t
2.36 g/t
199 g/t
232 g/tView entire presentation