Path Forward and Prospective Exploration Areas slide image

Path Forward and Prospective Exploration Areas

TSXV: ELVT OTCQX: EVGDF ADDITIONAL NEAR MINE TARGETS ROBUST PIPELINE THROUGHOUT THE PROPERTY W A Poorly Drilled to West Shows -1,600 meters Expansion Potential Reserves and Resources Defined over 1,500 meters 2 ELEVATION GOLD Largely Undrilled to East -3,100 meters Moss East Extension Moss West Extension Black Fin 6.28 g/t Au 1.6 git Ag 9.44 g/t Au 28.7 g/t Ag 8.23 g/t Au 39.1 g/t Ag 11.73 g/t Au 6.81 g/t Au 212.0 g/t Ag 9.00 g/t Au West Pit Center Pit East Pit 2.01 g/t Au 125.0 g/t Au 45.0 g/t Ag 3.82 git Au 4.8 g/t Ag 1.69 g/t Au 1.1 git Ag 0.42 g/t Au 4.2 git Ag 27.9 g/t Ag 1.09 g/t Au 2.90 g/t Au Open Open WO91-07 (historic) -116 m @0.45 g/t Au AR-214C 30.48 m @ 0.48 g/t Au, 2.5 g/t Ag Open Open AR21-522R 65.53 m @ 0.94 g/t Au, 18.7 g/t Ag WO89-05 (historic) WO91-03 (historic) AR20-315R AR21-479R -29 m @ 0.41 g/t Au -56 m @ 0.42 g/t Au 109.73 m @ 0.79 g/t Au, 24.1 g/t Ag 83.82 m @ 0.44 g/t Au, 4.7 g/t Ag AR20-377R AR21-458R Au (g/t) >3.00 2.00-3.00 1.00-2.00 0.50 1.00 0.30-0.50 0.15-0.30 0.002-0.15 7.62 m @ 0.59 g/t Au, 3.0 g/t Ag 25.91 m @ 1.01 g/t Au, 2.6 g/t Ag 38.10 m @ 1.43 g/t Au, 19.2 g/t Ag Multiple additional parallel and accessory veins throughout the ~165 km² land package Notes: Topographic surface as of November 14, 2021; Drilling as of December 1, 2021 news release; Viewing window approximately 1,800 ft wide Mineral Reserve and Mineral Resource outlines are approximate and are based on the October 8, 2021 NI 43-101 Technical Report on the Moss Mine prepared by IMC Inc. and filed on www.sedar.com B E 0.71 g/t Au 3.4 g/t Ag D Open Surface Rock Chip Sample Base of Mining Operations as of 14 November 2021 Mineral Reserves (1 July 2021) Mineral Resource (1 July 2021) -500 meters Drillhole grades Au 20.15 g/t Au shown 13
View entire presentation