Path Forward and Prospective Exploration Areas
TSXV: ELVT OTCQX: EVGDF
ADDITIONAL NEAR MINE TARGETS
ROBUST PIPELINE THROUGHOUT THE PROPERTY
W
A
Poorly Drilled to West Shows -1,600
meters Expansion Potential
Reserves and Resources
Defined over 1,500 meters
2
ELEVATION
GOLD
Largely Undrilled to
East -3,100 meters
Moss East Extension
Moss West Extension
Black Fin
6.28 g/t Au
1.6 git Ag
9.44 g/t Au
28.7 g/t Ag
8.23 g/t Au
39.1 g/t Ag
11.73 g/t Au
6.81 g/t Au
212.0 g/t Ag
9.00 g/t Au
West Pit
Center Pit
East Pit
2.01 g/t Au
125.0 g/t Au
45.0 g/t Ag
3.82 git Au
4.8 g/t Ag
1.69 g/t Au
1.1 git Ag
0.42 g/t Au
4.2 git Ag
27.9 g/t Ag
1.09 g/t Au
2.90 g/t Au
Open
Open
WO91-07 (historic)
-116 m @0.45 g/t Au
AR-214C
30.48 m @ 0.48 g/t Au, 2.5 g/t Ag
Open
Open
AR21-522R
65.53 m @ 0.94 g/t Au, 18.7 g/t Ag
WO89-05 (historic)
WO91-03 (historic)
AR20-315R
AR21-479R
-29 m @ 0.41 g/t Au
-56 m @ 0.42 g/t Au
109.73 m @ 0.79 g/t Au, 24.1 g/t Ag
83.82 m @ 0.44 g/t Au, 4.7 g/t Ag
AR20-377R
AR21-458R
Au (g/t)
>3.00
2.00-3.00
1.00-2.00
0.50 1.00
0.30-0.50
0.15-0.30
0.002-0.15
7.62 m @ 0.59 g/t Au, 3.0 g/t Ag
25.91 m @ 1.01 g/t Au, 2.6 g/t Ag
38.10 m @ 1.43 g/t Au, 19.2 g/t Ag
Multiple additional parallel and accessory
veins throughout the ~165 km² land package
Notes: Topographic surface as of November 14, 2021; Drilling as of December 1, 2021 news release; Viewing window approximately 1,800 ft wide Mineral Reserve and Mineral Resource outlines
are approximate and are based on the October 8, 2021 NI 43-101 Technical Report on the Moss Mine prepared by IMC Inc. and filed on www.sedar.com
B
E
0.71 g/t Au
3.4 g/t Ag
D
Open
Surface Rock Chip Sample
Base of Mining Operations as of 14 November 2021
Mineral Reserves (1 July 2021)
Mineral Resource (1 July 2021)
-500 meters
Drillhole grades Au 20.15 g/t Au shown
13View entire presentation