Investor Presentaiton
Oropesa Tin Project, Spain
2023 Mineral Resource Estimate Update
282,800mE
95% of 2023 MRE is classified either Measured or
Indicated Resources, totaling 18.5Mt at 0.39% Sn
•
38% of 2023 MRE is classified as Measured Resources,
increasing by 3.1Mt (+73%)
100% of 2023 MRE tonnes located within the 2022
Optimisation Study¹ US$30k/t Pit Shell are classified as
Measured or Indicated
800m RL
400m RL
Measured & Indicated
Mineral Resources
Total Mineral Resource
1
283,200mb
283,600mB
283,200m
Legend
Datum: ED50/UTM Zone 30
2023 Mineral Resource
2022 Scoping Study US$30K Pit Shell
7.42Mt
0.36% Sn [26,801t Sn]
18.53Mt
0.39% Sn [71,813t Sn]
19.60Mt
0.39% Sn [75,834t Sn]
9 All resources calculated using a 0.15% Tin cut-off grade.
This information was first disclosed under the JORC Code
2012 on 14 February 2023
Measured Mineral Resource
ELEMENTOS
283.600mP
800m RL
294,000mE
400m RL
284,400mE
TOMORROW'S TIN 13View entire presentation