Investor Presentaiton slide image

Investor Presentaiton

GCIE Near Term - Phase 1 Objectives 2023 cgx Build and operate initial phase of the Berbice Deep Water Port to service the highly active offshore oil and gas exploration industry and agricultural sector in the Guyana-Suriname Area • • 90x30 meter wharf platform and 49x12 meter approach trestle from shoreline into the Berbice River Capable of accommodating 2 Platform Supply Vessels or Anchor Handlers simultaneously • Site is flood protected . • • · • • • World-class compact yard, covered warehousing, and tubular storage on site Construction of access road and bridges and utility services Full range of services: water, bulk dry and liquid mud supply, cement, electricity, telecommunications, fuel, container mobilization of agriculture products Full range of security services and secure bonded area for controlled customs accountability (fenced and protected) Dredging of an access channel to 7m at low tide and basin alongside wharf to 8.5m at low tide, complete shoreline protection Full-service wharf support for offshore drilling Administrative offices and customs administration offices Workshop and covered warehouse Completely contained waste management • Fire protection system • Facility targeted to be fully operational 2023 • Full indemnification insurance will be procured to protect environment, existing infrastructure, public and client property www.cgxenergy.com 23
View entire presentation