Investor Presentaiton slide image

Investor Presentaiton

BANDEIRA - TYPICAL SECTION & DRILL HIGHLIGHTS Northwest 300m 200m A ITDD-23-188 Y BOUNDARY ITDD-23-073 ITDD-23-83 2.45% Li20/9.11m 100m ITDD-23-088 Section LT 600 NE ITDD-22-024 ITDD-22-050 ITDD-23-135 1.71% L120/5.72m 2.97% Li20/1.53m 1.37% L120/7.03m 1.99% LI20/5.84m 1.99% LI20/6.68m 1.43% L120/1.56m Om 2.07% Li20/3.40m 1.66% L120/8m 100m 1.30% Li20/8.95m 200m 1.39% Li20/7.78m 300m 190,000E 8,142,500N 1.21% L120/12.45m 2.10 % L120/4m 1.61% Li20/11.90m ITDD-22-025 ITDD- DD-22-021 Southeast A' DRILL HIGHLIGHTS (MAY 2022 JANUARY 2024) 1.62% Li₂O / 20m ITDD-23-062 1.29% L120/2.83m 2.22% L120/3.69m CBL'S CACHOEIRA LITHIUM MINE (Producing lithium since 1993) 1.24% Li₂O/18.14m ITDD-23-073 1.32% Li₂O/24m ITDD-23-065 1.94% Li₂O/14.95m ITDD-23-158 0.81% L120/2.71m 2.96% L120/1.57m 2.46% L120/2.0m 1.87% L120/4.19m 190.100 8,142.250N 190,200E ° 100 200m Previously Drilled Holes New Reported Drill Hole Spodumene-rich Pegmatites 190,300E 8,142,000N 829000 SIGMA LITHIUM CORP.'S BARREIRO LITHIUM DEPOSIT (forms part of the largest hard rock lithium deposit in the Americas) km 830000 8142000- 1.42% Li₂O/ 15.83m ITDD-23-078 1.31% Li₂O/24.01m ITDD-23-228 1.72% Li₂O/53.73m ITDD-23-221 1.65% Li20 / 16.23m ITDD-23-218 1.43% Li₂O/17.08m ITDD-23-061 1.73% Li₂O/13.57m ITDD-23-063 SIRGAS 2000 UTM 23S February 2024 Highlighted Drill Results Drilled/Reported Holes LCT Pegmatites Projected to Surface Soil Anomalies Claim Boundary Access Road 831000 to 832000 8141000- | 18
View entire presentation