Chuo Shinkansen Project - Status of Construction Progress
Planned route
Main construction contract section
Yamanashi Maglev Line
Nagano
Prefecture
Bo
5
Station
Station (main construction
contract)
Emergency exit (construction
contract)
Aichi
Prefecture
Gifu
Prefecture
11
17
9
14
15
TE
Yamanashi
Prefecture
10
4
1
Tokyo
Metropolis
8
2,3
7
16
18
6
Kanagawa
Prefecture
山
Yamanashi Maglev
Line
Great depth
section
1.
2.
3.
4.
5.
6.
7.
8.
12, 13
Great depth section
Shizuoka
Prefecture
FY2016 construction
contract
FY2015 construction
contract
This map is a copy of the one-millionth map of Japan issued by the Geospatial Information Authority of Japan (GSI) with
the approval of the Director-General of GSI. (Approval number 2013 copy No. 310)
Names of main construction contracts concluded thus far
Southern Alps Tunnel (Yamanashi construction section) [Yamanashi
Prefecture] (August 2015)
Shinagawa Station (North construction section) [Tokyo Metropolis]
(September 2015)
Shinagawa Station (South construction section) [Tokyo Metropolis] (October
2015)
Southern Alps Tunnel (Nagano construction section) [Nagano Prefecture]
(February 2016)
Meijo emergency exit [Aichi Prefecture] (April 2016)
Kita-Shinagawa emergency exit and electrical substation (underground
section) [Tokyo Metropolis] (April 2016)
Onoji emergency exit and other [Tokyo Metropolis] (April 2016)*
Shinagawa Station (non-excavation construction section) [Tokyo Metropolis]
(May 2016)
9. Hiyoshi Tunnel (Minamigaito construction section) [Gifu Prefecture] (June
2016)
10. No. 4 Minamikoma Tunnel (west construction section) [Yamanashi Prefecture] (July
2016)
11. Central Alps Tunnel (Yamaguchi) [Nagano and Gifu Prefectures] (August 2016)*
12. Nagoya Station (central east construction section) [Aichi Prefecture] (September 2016)
13. Nagoya Station (central west construction section) [Aichi Prefecture] (September 2016)
14. Ina Mountains tunnel (Sakajima construction section) [Nagano Prefecture] (September
2016)
15. Sakashita emergency exit [Aichi Prefecture] (October 2016)
16. Higashi Yurigaoka emergency exit [Kanagawa Prefecture] (November 2016)
17. Central Alps Tunnel (Matsukawa etc.) [Nagano Prefecture] (December2016)*
18. Kajigaya emergency exit and material loading area [Kanagawa Prefecture] (February
2017)
*Names of construction contracts concluded by Japan Railway Construction,
Transport and Technology Agency