Investor Presentaiton slide image

Investor Presentaiton

QUEEN LAPAGE A NEW ST IVES? Lefroy Boulder Shear Santa Anna 00 Invincible O/P (+1.5Moz mined) Speedway Shear A 000 oooboo Revenge 2020 C Leviathan O/P (+2Moz mined) 000 0 Ooooooooooboo O OOOOO 200 0000000 ००१०० 0000 Randall Shear 000000 000000000 Gap Fault A 2 km 2 km RGL Drilling superposed over the St Ives Camp ST IVES Past Production +14Moz Resources and reserves +4.4Moz (2019) 10 ooodoo00000000 Past Production 10koz QUEEN LAPAGE Queen Lapage Major Structures Maximum Au 0 - 0.01 g/t Au 0.01 0.05 g/t Au 0.05 -0.1 g/t Au 0.1 -0.2 g/t Au 0.2 - 1.5 g/t Au Resources and reserves TBA (2021) pending discovery. RIVERSGOLD LTD
View entire presentation