Year End Update & Project Overview slide image

Year End Update & Project Overview

SYRACUSE KANSAS WELLS & INFRASTRUCTURE Syracuse Gas Gathering System Completed Proposed Syracuse Associated Water Disposal System Completed כוהו 12 100 Proposed Tumbleweed Pipeline Producing Gas Show - WOC Permitted Location Salt Water Disposal Well 14 MILE INTERNAL GAS GATHERING SYSTEM PIPELINE WITH A CAPACITY FOR 100 WELLS IN SYRACUSE COMPLETING 15 MILE WASTE WATER DISPOSAL SYSTEM WITHIN SYRACUSE KANSAS 30 25 26 28 25 30 29 Common Delivery Point Co Rd.24 10 27 Overton 2A SWD RIVER ROAD 26 Levens 2-31 32 33 34 Levens 3-31 36 35 36 22 02 11 31 51 Levens 4-31 Levens 20 O Levens 3-6 01 06 05 04 03 02 01 06 O Levens 4-6 Co Rd.26 T Spiker 1-7 O 07 08 11 07 10 12 09 Co Rd.27 Simon 1-18 O 0 Hodgson Weaver 1-15 18 14 1-17 C Double 1-16 TO 15 18 14 Gould 1-14 13 17 19 Durleer 2-21 23 24 19 20 24 23 22 EXISTING WELL RECONNECTED NEW WELL COMPLETED AND CONNECTED WELLS DRILLED PERFORATED AND READY FOR COMPLETION WELLS DRILLED READY FOR PERFORATION AND COMPLETION WELL COMPLETED BUT SHUT IN AWAITING REPAIR Co Rd.29 " OR Spiker 1-29 Levens 1-27 25 30 26 30 28 29 27 26 25 WELL SITES PERMITTED AND CONSTRUCTED 35 35 32 33 34 36 31 3 31 36 Co Rd.31 02 06 04 05 03 02 01 01 Co Rd 32 11 12 07 08 09 10 11 Co Rd.33 12 WELL SITES PERMITTED 17 WELL SITES IDENTIFIED READY TO PERMIT 78 POTENTIAL WELL SITES (not identified on the map)
View entire presentation