Investor Presentaiton
COMPLETED ENGINEERING STUDY
Previously completed engineering study for Aries
concluded:
☐ Preliminary flotation trials indicate the niobium.
and tantalum are amenable to flotation, with
excellent recoveries
□ Further products (Feldspar, REOs & Zircon) may
be produced by secondary processing
Hydrometallurgical/pyrometallurgical processing
produces higher-grade product
☐ Key infrastructure challenges can be met:
Access road from shore of Motzfeldt Sound
to primary processing plant
Site mill within mountain to avoid costly
weatherproofed facilities
HT power line across Qororssuaq Valley
Reasonable economic reasons exist to progress
Motzfeldt through full feasibility study
NB: Metal prices at time of study (per metalary.com):
Ta205 = $114k p/t (adjusted for inflation) - Cf 2018
price = $152k p/t (33% higher); Nb205 = $31k p/t
(adj.) - Cf 2018 price = $42k p/t (35% higher).
Motzfeldt Sound
Qororssuaq ValleyView entire presentation