Investor Presentaiton slide image

Investor Presentaiton

7 | ARUNTA PROJECT EXISTING COPPER RESOURCE 2.5MT AT 2.8% CU EQUIV 17,840,000mN 400,000mE Stuart Highway Aeolian deposits Alluvial deposits Residual deposits Colluvial deposits Georgina Basin Sediments Granitoids Bullion Schist Hatches Creek Group Prospect Mulbangas (Cu) Arunta Project EASTERN Regional Geology METALS Prospect D EL 23186 410.000mE EL 23186 Road Runner◆ Tin Can Camp Hoop ◆Red Back Best Western Anvil Home of Bullion ⭑Nose →Grand Final Kilometres 420,000mE Arunta Project Ghan Railway, The Barrow Creek (EL 23186) is located in the Arunta region 282km north of Alice Springs in the Northern Territory. It Consists of the Home of Bullion project, Prospect D and is within the Barrow Creek pegmatite field HOME OF BULLION 2.5mt @ 1.8% Cu, 2.0% Zn, 1.2% Pb, 36g/t Ag and 0.14g/t Au (2.8% CU Equiv) PROSPECT D Cu/Ni/Ag mineralisation Largely untested area of mineralisation over 2km Located 4km off the Stuart Highway with good access to infrastructure (road/rail/gas) BARROW CREEK PEGMATITE FIELD Excellent potential to host LCT-type lithium pegmatites EASTERN METALS
View entire presentation