Investor Presentaiton slide image

Investor Presentaiton

Key Infrastructure (4/5) Bayan is currently constructing a new coal haul road and barge loading facility to facilitate the next level of expansion Key Assets Overview Coal Haul Road to Mahakam River (Under Construction) Mahakam River Barge Loading Facilities (Under Construction) 14 Coal Haul Road āœ“ In December 2019, the Company commenced construction of a 101km all-weather coal hauling road which will link the Tabang mine directly to the Mahakam River The road will be paralleled for the majority of this distance by a public road that the Company is also constructing The hauling road will have 7 bridges and over 150 culverts The Company plans to utilise 200-220 mt payload double trailers along this road to optimise its coal production āœ“ The road is scheduled to be completed in 2022 Barge Loading Facilities The Company has commenced construction of the barge loading facility on the Mahakam River In the initial phase this will have 3 x 4,000 tph barge loaders The facility will also initially have 3 x Side Dump for the receiving of coal trucks that will have 2 x 2000tph crushing capacity each There will also be 3 x 4,000 tph 5km overland conveyors linking the side dumps to the barge loaders This barge loading facility will be used to load 300' barges with 7,500 8,000 MT The facility will also include other supporting infrastructure including a camp, mess, workshops, fuel receiving jetty and fuel tanks PT BAYAN RESOURCES Tbk.
View entire presentation