Investor Presentaiton

Cerro Las Minitas Project Economics Modelled LOM Production: 24.5 Mt @ 0.2% Cu, 1.1% Pb, 2.6% Zn, 110g/t Ag, 0.09g/t Au - Average NSR of $US 128/t AgEq Sold (Moz) 20 18 16 14 13.4Mozs AgEq 12 10 8 Projected LOM Sales & AISC . Additional Production $18.00 Capacity $16.00 $14.00 Yrs. 1-8 Avg AgEq solds $12.00 $10.00 $8.00 AISC (us$/oz AgEq) $6.00 6 $4.00 4 2 $2.00 0 $0.00 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Year Ag Pb Zn ⚫AISC/oz AgEq LOM Ag/Cu/Pb/Zn sales are shown on an AgEq basis based on: Ag = $21.95/oz, Cu = $3.78/lb, Pb = $0.94/lb and Zn = $1.33/lb All-in Sustaining cost (AISC) is calculated as: Operating costs (mining, processing and G&A) + Incremental PTUS + Concentrate Transportation + Treatment & Refining Charges + Penalties + Sustaining Capital + Closure Costs + Silver Revenue Royalty and is reported on using a AgEq payable basis www.southernsilverexploration.com 13 SouthernSilver EXPLORATION CORP • Robust AgEq Production which Peaks in Year 8 Large-Scale Underground Mining Operation Modelled LOM Production: 24.5 Mt @ 0.2% Cu, 1.1 % Pb, 2.6 % Zn, 110 Ag, 0.09 g/t Au - Average NSR of $US 128/t 15-year mine life Annual Production of 11.3Mozs/yr AgEq (inc. 4.7 Mozs Ag) ⚫ LOM Production of 168.8Mozs AgEq (inc. 70.8Mozs Ag) ⚫ LOM AISC of $13.27/oz AgEq sold Further Project Upside • New deposits: deposits remain open laterally and to depth to be explored Gold Recovery: to be incorporated into the process flowsheet Engineering Updates: CapEx and OpEx efficiencies TSX-V: SSV OTCQX: SSVFF
View entire presentation