Investor Presentaiton slide image

Investor Presentaiton

Recommendation for site specific auction design || Auction design features Prequalification for Bidders Open for prequalified Bidders Explanation Prequalification requirements enable participation of serious Bidders / Investors, on the basis of developed project plan and obtained licenses Only Bidders / Investors that pass prequalification process are invited to participate in auction Requested submission of bid bonds Bid bond is secured by Bidders with objective to prevent non-installation Retention of bid bonds for penalization In case of non-installation or delay in installation, bind bond is retained. Bid bond amount should be in range 1.5 - 2% of average upfront investment cost calculated per kW Lead time for finishing installation It is recommended to be two years, from the end of auction. In case there are known grid connection problems and delays in licenses, this period should be extender for half a year Page 17 | 12 June 2019 | Reform of the Renewable Energy Support Scheme System in Bosnia and Herzegovina giz
View entire presentation