Investor Presentaiton slide image

Investor Presentaiton

Aluminium Vertically Integrated Green Business Model Power Segment • A cascade of 31 HPPS on the Angara river and 1 HPP on the Yenisei river harness the potential of one of the world's largest river systems located in Siberia ⚫HPPs are complemented by a network of 16 CHPS Metals Segment Bauxite 13.8 mt of Bauxite and 4.3 mt of Nepheline produced in 2018 c.70% self sufficiency in bauxites and nephelines with 100% to be achieved by 2022 via Dian Dian Project in Guinea Overall Bauxites reserves life is c.100+ years • • Monetising value chain from production to customer including grid and retail Alumina 7.8 mt of Alumina produced in 2018 100% self sufficiency in alumina Production of low carbon aluminium and premium aluminium alloys through combining the Group's assets in alumina and power generation >95% of En+ Group aluminium production energy met by hydro and other carbon-free power sources 3.8 mt of Aluminium produced in 2018 93% of Aluminium production in Russian Siberia 2018 energy used by sources² 2.4% 0 97.6% Non-carbon energy Thermal Fully integrated and highly self-sufficient green business model Source: Company data, CRU. (1) Boguchansk HPP operated by RusHydro (a part of BEMO project a 50%/50% JV of UC RUSAL and RusHydro, which also includes Boguchansk aluminium smelter) is not included to Power Segment. (2) May vary from year to year depending on the water level on HPPS. 28 Ent GROUP
View entire presentation