Investor Presentaiton
Aluminium
Vertically Integrated Green Business Model
Power Segment
• A cascade of 31 HPPS on the Angara river and 1 HPP
on the Yenisei river harness the potential of one of
the world's largest river systems located in Siberia
⚫HPPs are complemented by a network of 16 CHPS
Metals Segment
Bauxite
13.8 mt of Bauxite and 4.3 mt of Nepheline produced in 2018
c.70% self sufficiency in bauxites and nephelines with 100% to be
achieved by 2022 via Dian Dian Project in Guinea
Overall Bauxites reserves life is c.100+ years
•
•
Monetising value chain from production to customer
including grid and retail
Alumina
7.8 mt of Alumina produced in 2018
100% self sufficiency in alumina
Production of low carbon aluminium and premium aluminium alloys through combining the Group's
assets in alumina and power generation
>95% of En+ Group aluminium production energy met by hydro and other carbon-free power sources
3.8 mt of Aluminium produced in 2018
93% of Aluminium production in Russian Siberia
2018 energy used by
sources²
2.4%
0
97.6%
Non-carbon energy
Thermal
Fully integrated and highly self-sufficient green business model
Source: Company data, CRU.
(1)
Boguchansk HPP operated by RusHydro (a part of BEMO project a 50%/50% JV of UC RUSAL and RusHydro, which also includes Boguchansk aluminium smelter) is not included to Power Segment.
(2) May vary from year to year depending on the water level on HPPS.
28
Ent
GROUPView entire presentation